Loading…
Loading…
62,221 results • Best match
Kuzhalmannam Block Panchayath 2024 25 Project No 103/25 Renovation and Electrification of SC Hostel Kottayi-Electrical work
1. Electrical work.
Construction of RCC cable trench, supply and laying of HT cable for Crude Oil Import Terminal of M/s Numaligarh Refinery Limited.
Filling sweet sand up to 900 mm height including collecting, conveying by private trucks/dumpers within a lead of 40 km (avg.) and all lifts with covering at the top to prevent spillage of sand during transportation, loading at one end & unloading at other end, spreading and laying in layer in cable trench after laying of cable with supply of all labour, materials, T&P, all taxes, royalties, running and hire charges of truck/dumpers including gate entry fees etc. complete as per Scope of Work.
Relay testing and calibration along with associated electrical works at WON Basin, Vadodara
Government eProcurement System Created By: Akshat Agarwal Created Date/Time: 11-May-2026 06:50 PM Tender Title: Relay testing and calibration along with associated electrical works at WON Basin, Vadodara Tender ID: 2026_ONGC_269589_1
Electrical works for Transit accommodation for Kashmiri Migrant at Lethpora Barsoo
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Repair and maintenance works to Borewell submersible motor,starter, panel Board, Compressor, motor, Remove and refixing Stuckup motor work , Flushing of borewell,Supply and fixing of MS Kiosk Chamber, Electrical Arrangements, MS Kiosk, erection of mo
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Premonsoon maintenance and repair of HT electrical installations such as switchgear transformer VCB HT Relay ACB control panel including allied works of 3rdACPS CPSACPS2nd ACPS at Paschim Chowbhaga PS Anandapur District South 24 Parganas duri
Following tests are to be performed for the 11 kv VCB, 4 panel (1 no incoming and 3 nos outgoing) and test report to be submitted in tabular format in triplicate mentioning the instrument used with calibration certificate. I Electrical Test: Insulation Resistance Test (5 kV): Phase-Phase, Phase-Earth. H.V test of 4 nos VCB Panels ii CT/PT & Metering Compartment IR test for CT/PT secondaries. Polarity & ratio checks. Check wiring tightness, PT fuses. iii Busbar System IR test of busbars. Inspect for dust, corona marks, rodents. iv Cable Terminations Inspect heat shrink/ epoxy terminations. IR testing of cables. Tightness check & thermography. v Transformer IR & H.V test. For 3 nos transformer vi Earthing System Earth continuity inside panels. Earth electrode resistance. Check earthing of CT/PT frames and panel body.