Loading…
Loading…
65,318 results • Best match
15500Annual Plan-DPT TSR 2024-25 Construction of Toilet block in National HighSchool - Thalikulam Division - Electrification-Pro No. S1334/25, Thalikulam BP-General Electrical Work
OD504571/2025-2026:Supply and providing earth clamp for cable gland earthing up to 2x10 sq mm AYFY cables with 20x1 mm copper strip and 12X3 mm brass bolt and nut etc as required
Facility Management Services - LumpSum Based - ELECTRICAL EQUIPMENT MAINTENANCE MEDICAL EQUIPMENT MAINTENANCE FURNITURE MAINTENANCE PAINTING WORK; ELECTRICAL EQUIPMENT MAINTENANCE MEDICAL EQUIPMENT MAINTENANCE FURNITURE MAINTENANCE PAINTING WORK; Con..
Electrical and IT works in Conference Room B108 of Har Gobind Khorana Block at IIT Ropar
Supplying and fixing following way, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415 volts, on surface / recess, complete with tinned copper busbar, earth bar, din bar, interconnections, powder painted including earthing etc. as required (But without MCB / RCCB / Isolator)
Shifting of Sub-LT Panel from Laundry Block to PGT Hostel with allied Electrical Installation work for construction of Working Women Hostel by demolishing Laundry Block, Garage and kitchen for NTS in the premises of Chittaranjan Seva Sadan COGCH, Kol
Laying of cable above 3½ core 90 sqmm and upto 3½ core 150 sqmm on wall/surface including S & F MS clams with earthing attachment in 2 x 10 SWG GI (Hot Dip) Wire, making hole etc. as necy., mending good damages and painting
Electrical and instrumentation works for Bulk LPG facility providing at M s Tirumala Tirupathi Devasthanams Tirumala Andhra Pradesh
Electrical and instrumentation works for Bulk LPG facility providing at M/s Tirumala Tirupathi Devasthanam’s, Tirumala, Andhra Pradesh
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of South Vellarappilly, Kandanthara and East Okkal LIS under Electrical Irrigation section Kalady- Electrical -General Electrical Work
... Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs ...