Loading…
Loading…
65,318 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - OPERATION and MAINTENANCE WORKS AND DEPLOYMENT OF MANPOWER FOR O and M OF 220 AND132 KV VARIOUS SUB STATIONS UNDER ETC II MORADBAD; Substation, Switchyard, Electrical Sy..
and Installation of Plant Systems/Equipments (Version 2) - OPERATION and MAINTENANCE WORKS AND DEPLOYMENT OF MANPOWER FOR O and M OF 220 AND132 KV VARIOUS SUB STATIONS UNDER ETC II MORADBAD; Substation
Annual Maintenance Including repair works and electrical works to Court hall for Court building in Gangavathi and Karatagi town, Koppal Dist.(GEN)
Supply, installation, testing and commissioning electrically driven Terrance pump of capacity 450.0Lpm at 35.0m Head bronze impeller pump coupled to electrical driven motor with suitable HPwith all th...
Schedule of Labour for Electrical Wiring with installation of Distribution Lights Fans Power Points 11 kv VCB panel 33 kc CR panel with allied works at Tarui 33 11 kv Sub Stn at Tarui under Arambagh Division WBSEDCL
Supply of Hot Dip G.I.flat 65x6 mm and earthing of 11 kv system by rising the flat from Earth mat / Pit by mean of welding & bolting as per Indian Standard, approved drawing & design of WBSEDCL and direction of Supervisory Officer. Welding must be done with using good quality sticker and G.I. Spray, including proper scraping and smoothing the surface.
Erection and laying of 33 KV 300 sqmm cable at proposed 33 KV Sachivalaya feeder emanating from 132 33 KV Medical College GIS in the area in the area of AEN HTM II JPD Rambagh Jaipur
(B)G.O. switch . without earthing blade.
Retender- Annual Plan- Pro.No.92/24.25- Completion of Pullupana Samskarika Nilayam, Electrification- CDLM BP.-- Electrification- General Electrical Work
Annual Plan-IJK Muncipality Parappuram Samskarikanilayam 3rd phase -Electrification-IJK Muncipality So 217/24- Electrification-General Electrical Work