Loading…
Loading…
6,046 results • Best match
Construction of gate and Repair of Pavers at R V Desai layout garden in W No.8 Dharwad Division
Steel Fabrication
Improvements of Vijayanandanagara, Someshwaranagara, Shankaranagara and other allied works in Rajeevnagara ward no.46
Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/...
Improvement of roads and drains in Jaimaruthinagara, 35th main, Spandana Hospital road and Surrounding area in Nalvadi Krishnaraja Odeyar ward no.50
Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/...
CONSTRUCTION OF CC DRAIN NEAR DASTHAGIRI KATTE SCHOOL AND ANGANAVADI AND RAMP FOR HANDICAPT SCHOOL(CAT-II A)
Steel Fabrication
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER JAMSHEDPUR GA (CITY AREA) FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC).
Steel structure Fabrication
Construction of additional class rooms in the existing Govt. PS Prabhatnagar at Prabhatnagar under Core Urban Region Economy in Hyderabad District
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etcetc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing, vibrating and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS .Columns