Loading…
Loading…
6,028 results • Best match
Raising of boundary wall at 33 kv s/s Manai and construction of toilet block at Manai, Daizer, Indroka (R/W)
P & Fabrication steel rainforcement for RCC work including cutting, bending placing in position and binding complete including cost of binding wire in founcatino, etc. upto plinth level. cold twisted (IS:1786) bars. Up to floor three level (B-23/4.13.2)
Upgradation of power line infrastructure at REIZ Bhiwadi
Supply & fabrication steel structure with MS channel / angle / joist / ISMB / sheet etc. including welding, rivetting, cutting, nut & bolt , one coat of primer & two coat of enamel paint etc. as required complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .
Constructing Eight Suited Guest House in Place of old Condemned Guest House at Hanumakonda, with G+1 building Subwork: Providing Lift Facility in Eight Suited Guest House in Place of old Condemned Guest House at Hanumakonda
Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS- Ground Floor
Reconstruction of storm water drain with culvert at Podanur Bajanai Kovil Veedhi in Ward No 85, South Zone.
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications .
Improvements to Choultry Building of Sri Durga Bhirava Brhmanan Annadana Satram, Bhiravakona(V), CS Puram(M), Prakasam District
(CONSTRUCTION OF FIRST FLOOR ROOMS OVER EXISTING BUILDING OF BRAHMANA ANNADHANA SATHRAM AT SRI TRIMUKA DURGA BHYRAVESWARA SWAMY TEMPLE BHIRAVAKONA,AMBAVARAM(V),CS PURAM(M) PRAKASAM(Dt).)VRCC M20 Nominal mix using 20mm size hard granite m/c graded metal(coarsed aggregate)including cost andconveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site with all steel centering,shuttering,machine mixing,laying ,vibrating, lifting,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS (A)Columns.
Construction of APARA KARMALA BHAVAN in Div no.04 Under AE-VII Section(11th call)
Supply and placing of the M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including tremmy pumping,laying concrete,curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. Bored cast-in-situ under reamed piles includig bore pile stem and under ream bulbs.