Loading…
Loading…
6,138 results • Best match
Providing and Fixing Furniture for Ch Type 448 Quarters in Sector 28 at Gandhinagar
fabrication, supply and installation including adhesives, labour, tools, transport and
Dismantling of Pumps Motors and Desilting, cleaning of pump well, sump well works at all Ghats SPS and Repairing and replacement of SS Y piece and SS Bend at Dr. R.P.Ghat SPS, Varanasi
Dismantling of old delivery pipe line 450mm dia DI – 6 Nos. one by one and dismantling of old delivery “Y” Piece SS Pipe one by one 450x 350mm dia size in 18mtr. deep in sump well after replacement/ Supply and fabrication of “Y” piece SS Pipe grade (316 ) 350mm dia bore size 10mm thickness- 10mtr. Length and 450mm dia bore size 10mm thickness 4mtr. Length with suitable size SS flange with rubber packing, Nut-bolt etc.& including all cost of material, labour charge T&P in all respect complete.( essential work)
Reconstruction of Storm Water Drain at Muniyappan kovil street and Ward areas in ward no.73 of west zone.
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc.
Construction of Storm Water Drain at Murugananthapuram 2nd Street West in Ward No 19
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including Cost of Mortar Plasticizer, curing etc. complete and as directed by the departmental officers. (Dummy columns should be at least 1 metre height)-Mixing by mechanical means
Construction of Storm Water Drain at Muruganandhapuram 2nd Street East in Ward No 19
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including Cost of Mortar Plasticizer, curing etc. complete and as directed by the departmental officers. (Dummy columns should be at least 1 metre height)-Mixing by mechanical means
Restoration of rain damages to various WSS LWSS under Jal Shakti Sub Division , Joginder Nagar in Tehsil Joginder Nagar Distt Mandi HP SH Providing, supplying , laying, jointing, testing and carriage of various dia s GI pipe PDNA
Providing, Laying ,jointing, with circumferential butt joints by electrical arc welding (Welding thickness shall be equal to pipe wall thickness) and testing of G.I Pipe of Jindal/Surya Roshani or of approved rate contract of DGS and D / HP Govt make of following diameter confirming to IS:1239:1990 (Part-ii) (latest with up to date amendments having wall thickness as specified below capable of withstanding required test pressure , including manufacturing and fabrication of reducers taper all shorts pieces, bends etc as per site requirement made from parent tubes. The laying of pipe shall also include flanged joints duly welded in three layer (Two inner and one outer) Where ever required as per direction of Engineer in charge (Earth work in trenches and the cost of flanges I/C nut and bolts gasket will be measured and paid for separately) and all operation such as cutting welding and jointing fabrication of bends tees i.e lowering and laying in excavated trench to ensure required level including flushing cleaning and hydraulic testing complete in all respect to the entire satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The welding electrodes shall be as per IS 814 of Advani Overlikon/Over cord s/s make.The damaged portion of the pipe and all specials (if damaged during laying and jointing operation of pipe ) made from the parents tube shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paints over a priming coat as per AWWA specification C-203-1978. The rates also includes entire carriage of material ,flushing, Cleaning and Hydraulic testing, complete in all respect and to the entire satisfaction of Engineer in charge with in all leads and lifts