Loading…
Loading…
6,709 results • Best match
PROVIDING 110 mm HDPE Pipe line,CC Road and CC DRAINS AT SAGARA COLONY EAST SIDE CROSS ROADS IN DIV.NO.52 AT 144 SECRETARIAT UNDER AE-04 SECTION OF GMC. (3rd call)
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
Construction of CC Drain & Providing CC Road to the Bandla bazar to Rai Bahadur meda juction in Div.no.13 Under AE-8 Section.
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
Providing CC Road and Construction of CC Drains from srinagar 1st line venkateswara swamy temple to sarada colony 1st line vai Mallikharjuna peta main road In Div No 50 Under AE-12 Section. (RECALL)
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
Costruction of CC Drains and Providing CC Road to Bongarala beedu 1st and 2nd cross roads from 1st line to 4th line Div No.55 Under AE-14 Section(3rd call).
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
Construction of 5 Storied Rajagopuram on the South Side Relating to Sri Lakshmi Chennakesava Swamy Temple, Vonipenta(V), Mydhukur(M), Kadapa District
V.R.C.C (1:11/2:3) using 20 MM size HBG graded chips with nominal mix SS-5 using necessary quantity and excluding cost and conveyance of steel per cum of concrete including cost and conveyance of all materials and all labour charges, seigniorage, curing, centering ( Using Steel) etc., complete as per APSS No.403 with BIS 456-2000 but excluding the cost of steel and its fabrication charges.a) plinth beam
Re-Construction of Sri Pakkalamma Ammavari Temple, Nagaram(V&M), Bapatla District
VRCC M20 Nominal mix using 20mm size hard granite m/c graded metal(coarsed aggregate)including cost andconveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site with all steel centering,shuttering,machine mixing,laying ,vibrating, lifting,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS (Pillar Footing).