Loading…
Loading…
6,703 results • Best match
Supply and fixing of Split AC units to SVIMS Cliic (Employees OP) building in SVIMS Hospital, Tirupati (Part-A)
Supply, Fabrication of 1set MS bracket suitable for fixing out door unit of split AC unit.
REPLACEMENT OF DAMAGED POLE 11KV OR LT LINE IN UNFORESEEN CIRCUMSTANCE IN EUDD 11KV EXPRESSWAY NOIDA
Erection & fabrication of following material including fitting of all reqired accessories of 11 KV / LT line as per RESPO schedule.
REPLACEMENT OF DAMAGED POLE 11 KV OR LT LINE IN UNFORESEEN CIRCUMSTANCE IN EUDD 11 KV STADIUM NOIDA
Erection & fabrication of following material including fitting of all reqired accessories of 11 KV / LT line as per RESPO schedule.
Providing Laying testing and commissioning of outflow pipeline of Drainage Gallery of Bisalpur Dam
Providing and fixing steel, gate, grating and grills made of angles, tees, square bars, flats or black pipe with hold fast and fitting complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide and two coat of enamel paints. Rate is exclusive of GST.
AUGMENTATION OF 33 kV BEMINA-BBSHAH LINE FROM 0.15 TO 0.2 ACSR
Providing, Fabrication and Fixing of GI Channel, GI X-arm with Belting/Brace Angle Iron/top Bracket including clamp of sorts (as per site requieement)
Repairing of two nos. record rooms of PWD, Division Office including construction of new iron shelf under Burdwan Division, P.W.D.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m