Diversion of Flood water from Maski nala to Kanakanala Valley near Aryabhogapura Village, Kustagi Taluk, Koppal District and Modernization of Kanakanala Project.
Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platfom, railing, ladder with all accessories for operating c...
Repairing of 600mm dia. Delivery pipeline of pump unit no.-1 with other allied works at Nonadanga drainage pumping station.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m
Construction of 02 No. Sump Wells each at 2.21 MLD STP Rajbagh and Aramwari including allied works
Providing ,fabrication erection of MS working plate form over the main pumping sump. The MS frame is to be fabricated out of ISMB, ISMC and angle iron. The frame is to be covered by MS chequered plate 6mm thick and the openings at the requisite places are to be fabricated with hinge mechanism for the lifting and lowering of the pumping units during maintenance .Fabrication and erection of MS ladder 6 mtr long to be erected inside the sump. The details of ISMB, ISMC, Angle iron and chequered plates are as under. i. ISMB 150=10 RM.@ 15Kg/RM=150 kg ii. ISMC 100=10 RM @ 9.56Kg/RM=95.6 kg iii. ISA 65=30 RM @5.80Kg/RM=174 kg iv. Chequered Plate 6 mm=20 SM @47.10Kg/SM= 942kg Total weight=1361.6 kg
Annual Rate contract for repairs/ replacement to TATA make Departmental Water Tankers for the financial year 2026-27 under Tanker Services
Fabrication/Providing/Fitting of battery box made out of MS Strips and angle Iron of required size and thickness as per requirement
Provision of Relay Huts at Non-Interlocked LC gates ( 01 no in LLH-BRMH section, 02 nos in BWN-KWAE section, 02 nos in RPH-DUMK section in HWH Division
"Fabrication and manufacturing of solid precast concrete element for building as per approved plan (excluding foundation brick work upto plinth level) with provisions of shear keys, connecting loops, dowel rubes and proper lifting accessories for walls, beams, slabs, stairs column with prestressing steel stands reinforcement & wire fabric. Erection & installation of 1 Precast/prestress concrete elements incorrect & final position with proper line level & plumb at site making all arrangements (i.e.cranes, push-pull jacks and another T&P for lifting placing & alignment of elements, within erection tolerance.) Laying of approved floor tiles, finishing work with cement base putti, acrylic based putty. Epoxy paint, UPVC door frames, PVC doors, shutters & other misc. allied aluminium work with polyester powder coating, glassing doors & windows with 5.5 mm thickness float/frosted glass, anodizing aluminium grill etc. as per approved drawing and with all transportation loading, unloading etc. as per direction of engineering incharge."
Construction of CC Road from Icchapuran Balaji Mandir to Jain Mandir via Underpass Railway Line and Shubhash Fouji house in Ward No. 59 in Sikar.
Fabrication, supply of flanged/ plain ended MS pipe made from MS sheet strips of relevant IS specification of approved thickness by welding, lowering, laying, aligning, fixing in position at all level/ depths in trenches complete (excluding flanged jointing wherever required) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.MS pipe upto 600mm dia (with minimum 5mm thickness sheet)