Loading…
Loading…
6,416 results • Best match
SITC of New DG SET and related Electrical work with 04 years CMC (after 01 Year DLP) and 05 Years Operation at Various Community Health Centers of Ahmedabad Municipal Corporation.
MS Fabrication work with one coat of primer and two coat of
Cable shifting and other associated works at IGCAR, Kalpakkam
Supply and Installation of MS Brackets, Supports, Frame work, Clamps, Base Channels, etc. fabricated out of angle / Channel / Rods etc. The rate quoted shall include the cost of fabrication / welding, cleaning and painting/ galvanising as follows including supply of required, fasteners, nuts, washers, etc.(Refer Sec VI, Clause No.11).
Providing New LT Distribution Panel boards to replace the existing damaged panels at SPRH Generator room and SPRH Building, Tirupati
Design, fabrication, supply and errection of L.T indoor type cubical panel board made with 14 SWG CRCA sheet. The size of panel should be 2300(w)mm x 1800(H)mm x 500(D)mm and 600mm extra breadth on ACB side and panel should be mounted on base ISMS MS channel size 100x50x6mm and fixing firmly as directed execution. The following switch gears, bus bars etc., should be supply and fixing in the panel firmly, and the panel with necessary individual doors, separate chambers for bus bars, out going cables and spider links should be provided on outgoing sides etc. All the doors shall be provided with rubber beading and door knobs. The Top of the box should have provision for Incoming and Outgoing cables. The entire panel should be powder coated with siemens grey color through 7 tank process.
SMART LOAD MANAGEMENT OF 2 x 1250 kVA with Electrical infrastructure with Wireless and SCADA Automation Online Monitoring WEIGH BRIDGE AUTOMATION FOR DATA UPDATING AND ONLINE MONITORING File No- 74/26x6/4.
Supply, fabrication and erection of ngle/channel/flat iron fitting for overhead line & sub-station etc such as 'D' bracket, cross arms, top clamp, 'V' cross arms, back/support clamp or other similar work etc. including nut bolts of required size, making holes, fabrication, welding, cutting, etc. and painting with one coat of red oxide paint & two coat of aluminium paint as required as per specification.
Construction of Maintenance Room and Combined Gas Cylinder and Compressor Room at North Bengal Dental College and Hospital , Darjeeling
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. i) For roof truss work. a) Span up to 12 Mtr.
Provision of 3 phase supply to proposed 2x25 kV TSS at Badnera i.e. (A) Supply & erection of EHV equipments for proposed 3rd phase of TSS-I & II bay at 220 kV Badnera S/Stn under EHV O&M Division, Amravati. (B) Stringing of 3rd phase for existing 220 kV Badnera TSS - I & II line (C)Conversion of existing 2-phase to 3- phase of 132kV Akola-TSS DCDC line along with replacement of existing 132 kV TSS I & II Bay equipment's under jurisdiction of EHV Line Maint. Sub Division - II, Akola & 220 kV S/Stn Akola under EHV (O&M) Division, Akola & 400 kV R.S. Division, Akola respectively, in connection with Up-gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System in Bhusawal division of Central Railway to meet 3000 MT loading target.
including fabrication, painting to angles in