Loading…
Loading…
29,618 results • Best match
Establishment of 40 nos New self supported wireless Towers of different height Including Fabrication Erection Installation and Commissioning
Establishment, Fabrication, Erection Installation & Commissioning of 45 Meters Self Supported Wireless Tower
NCTPS II M I Circle MPM Unit I Mill 1H Supply fabrication Erection Testing and commissioning after dismantling
Charges for fabrication, erection of mill inlet hot air duct (from main hot airbus to above 9 meter level as per standards and as per the direction of site incharge. work involves fabrication of duct, venturi, expansion bellows, transition bend duct with stiffner Channels angles as per drawing .Complete welding using leak testing leading lifting, loading and transporting charges special electrodes ,cost of consumables and Hire charges for crane, winch and T&P’s.
Providing,fabrication and supply of stopdam gates size 1.50m x 3.10m- 4 nos for Fulipura stopdam cum causeway.
Providing,fabrication and supply of stopdam gates size 1.50m x 3.10m- 4 nos for Fulipura stopdam cum causeway.
Limited Tender Enquiry for the Fabrication and Installation of reception counters at various locations at TISS Mumbai Campus
Fabrication and installation of reception counter using BWP grade plywood of required thickness on wooden batten framework, finished externally with 1 mm glossy PVC laminate and internally with 1 mm laminate, including pedestal drawer unit, polished granite top, all necessary hardware and accessories (hinges, channels, handles, locks, etc.), institutional logo and name board, adhesives, fasteners, edge banding, complete with transportation, loading, unloading, on-site assembly, installation, finishing, cleaning and handover, executed by skilled and semi-skilled carpenters, all as per specifications and directions of the Engineer-in-Charge. (Design shall be similar to the sample counter at the reception of Vice Chancellor’s Office)
Work of fabrication and machining of maintenance material required for SE(Workshop) section under AE(M)WWES I
Work of fabrication and maintenance of machining material required for SE(Workshop) section under AE(M)WWES I
Supply and Installation of Water Tank and Fabrication of Water Tank pedestal for RO Unit at SDH Bhaderwah
The work involves complete site clearance and preparation for the Water Tank Pedestal. The scope includes removal of unwanted materials, vegetation, debris, and dismantling of existing structures obstructing the construction area. The job also covers breaking and removal of old or damaged RCC (reinforced cement concrete) structures, such as existing foundations, floor slabs, and plinths within the designated site boundary. All RCC breaking work shall be carried out using suitable mechanical breakers or manual tools, ensuring safety of workers and nearby structures. complete scope of work had from SBD