Loading…
Loading…
29,729 results • Best match
Rep. of bent damaged mudguard, bonnet, ladder, Fabrication of 02 Nos. jack leaving pad of TIL Crane Reg. No. JH10AS 2697 at Tetulmari OCP, Sijua Area.
Rep. of bent damaged mudguard, bonnet, ladder, Fabrication of 02 Nos. jack leaving pad of TIL Crane Reg. No. JH10AS 2697 at Tetulmari OCP, Sijua Area.
Fabrication of new base plate and overhauling of Kirloskar 6UP4 Pump for firefighting arrangement in Coal Stock 13, 18 and 19 at SOCP, IB Valley Area.
Fabrication of new base plate and overhauling of Kirloskar 6UP4 Pump for firefighting arrangement in Coal Stock – 13, 18 and 19 at SOCP, IB Valley Area.
Design, Drawing, Fabrication, Supply, Erection, Testing and Commissioning of Minor Gates (No. M4, M5, M6) of Bijapur Distributary at ISP Main Canal Narmadanagar distt. Khandwa (M.P.)
Laying Diversion and fabrication of the 8 inch 10 inch and 6 inch pipe line including transportation for various location of Amal.Joyrampur Colliery under Lodna Area.
Work contract for fabrication and patching work of CW return line in the hot basin area cooling tower model 1512-10(18 A.T) at ATPS Chachai.
Fabrication of 90 degree bend of 600 NB ERW pipe for the hot water basin including installation of existing valves
Repairing the worn out under carriage right sides and thread making also dismantling and assembling the same after fabrication for CK300 B0744 at ADIC Kusunda Area
Jobs to be done: DESCRIPTION OF WORK: REMOVAL/DISMANTLING:- 1. Dismantling of worn out under carriage set from the machine. 2. Opening of the track chain assly right side. 3. Removal of roller guards and wornout carrier rollers. PLACEMENT AND FITTING:- 1. Fitting of an old under carriage right side, including the following components:- ( Track chain assly, carrier rollers, Track rollers, Roller guards, Ensuring proper alignment and tightening of all bolts and fittings) SAFETY AND QUALITY MEASURES:- 1. Adherence to all safety protocols during dismantling ans assembly operations. 2. Use of appropriate tools and equipment to avoid damage to parts and ensure precision. 3. Inspection of all replaced components for quality assurance. Material Required:- Gauging electrode-11 kg, Steel electrode-05 kg, HT bolt -16 nos, Washer-16 nos. Repairing work should be completed with all required materials and manpower.