Loading…
Loading…
29,729 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabrication and Installation of 04 no of skid mounted portable rest shelter; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabrication and Installation of 04 no of skid mounted portable rest shelter; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Fabrication of 02 Two number 120 Drum new pontoon at RJML OCP; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Fabrication of 02 Two number 120 Drum new pontoon at RJML OCP; Service Provider
Rough cost estimate for providing and laying fabrication of 2 Nos. Foot-over-Bridge (Puliya) on Gaunchhi Drain in Auto Pin Jhuggi, Ward No. 03, Ballabgarh.
providing and laying fabrication Foot-over-Bridge on Drain complete in all respect
Rep. of Undercarriage (RHS), damaged boom assembly and fabrication of stopper (02 Nos.) of EKG Rope Shovel Sl. No. HMB 578 at ASBN OCP, Sijua Area.
Rep. of Undercarriage (RHS), damaged boom assembly and fabrication of stopper (02 Nos.) of EKG Rope Shovel Sl. No. HMB 578 at ASBN OCP, Sijua Area.
New fabrication and making of 50 Nos. conveyor belt top roller (size 100mm dia x 1400mm) for Feeder Breaker of Phularitand Feeder Breaker of AMP Colliery..
Fabrication of shall as per size 100 mm dia X 1400 mm by 100 mm pipe and machining
Onsite Fabrication, Erection, Testing and Commissioning of One LT Secondary Control Cubicle with Weatherproof Shed for Existing 630 KVA Transformer Installation at Chalkari Site, Bokaro Colliery