Loading…
Loading…
32,734 results • Best match
Construction of shed for Transit storage at Q3 area
Supply, fabrication & erection of Structural steel work, using MS pipe / square or rectangular tubes connected with plates at top & bottom of pillars including cutting, bending, welding, fabrication, erecting in position, aligning the erected structure, cost of all accessories, welding rods, hire for tools and plants etc. complete.
Construction of High level Bridge at km 11/6 of Kilveethi-Minnal -Ameerpet Road (M-792) in lieu of existing causeway (Job No TN-CRIF-2025-26-CNI-05)
Supply and fabrication of Fe-240 (Mild steel Grade-I) steel required of all RCC items of work involved in the schedule including cost of steel at site and cost of fabrication labour charges for cleaning the rods, straightening, cutting, bending, tying grills including ...
Construction of Additional Major bridge at km 11/10 of Pollachi - Valparai Road (SH-78)
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, ...
PKG 05 Strengthening / Upgradation of Sivagalai Nainarpuram Road 0/0-1/300, Kettiammalpuram-Udayarkulam Road in Thoothukudi Block of Thoothukudi District under NABARD RIDF 2026-27
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication,... cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, ...
Consrtuction of High Level Bridge in Lieu of Existing Damaged Causeway at Km.0/0 0/8 of Walajabad Thirupulivanam road.
Supply and fabrication of steel grade Fe-500D (HSD) steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, ...
Contract for piping , Modification of piping works and other connected Mechanical works in various plants.
Fabrication and laying/ replacement of Metallic pipe lines. Details as per Sl No 7 in BOQ