Loading…
Loading…
33,884 results • Best match
09/SE/EWC/AYO/2026-27
Lightening Arrestor/ Post Insulator Structure Fabrication of 1 No Lightening Arrestor structure & 1 set of Post Insulator structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9x0.3 Mtr providing... Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of ...
Widening from Two lane with Paved shoulder to Four Lane and Strengthening at km 3/0 - 7/0 of Kannamangalam - Arni Road including Reconstruction and Widening of Culverts, Construction of Drain, Center Median and Providing Bus lay bays -TVM-183
Supply and fabrication of STEEL Fe500/ Fe500D/ Fe550/ Fe550D grade with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, ...
Shifting of pump-motor set, replacement of B/D 4000 GPM 200 Mtr head and its pipe line shifting diversion and extension of 8in/10in dia delivery ranges for new position at Jamunia patch of ABOCP Mine
Cutting of 8" dia M.S pipe for fabrication of half bend (8 Nos x 3 x 25.14")
Shifting of 3200 GPM and 1000 GPM pump motor set along with diversion and extension of 8in/10in dia delivery ranges from 12 poles to Deco face of ABOCP Mine
Cutting of 8" dia M.S pipe for fabrication of half bend (7 Nos x 3 x 25.14")
Repairing, rectification and full overhauling with spares of 2 nos 450 GPM pump assembly A) 450 GPM, DSM4RM, 125/100 located at 15 no. filter plant B) 450 GPM, DSM4RR, 125/100 located at laiyo filter plant Jharkhand OCP under Hzb area.
Fabrication of new shaft using EN-8 steel material, including precision machining, key slot cutting, and key preparation on lathe as per standard dimensions, along with casting and machining of impeller to standard size and final assembly fitting. for A
Shifting of pump-motor set, assembling of pipe line shifting diversion and extension of delivery range as per new position at Deco purba coal face of ABOCP mine
Cutting of 8" dia M.S pipe for fabrication of half bend (8 Nos x 3 x 25.14")