Loading…
Loading…
33,886 results • Best match
Shifting of pump-motor set, assembling of pipe line shifting diversion and extension of delivery range as per new position at Deco purba coal face of ABOCP mine
Cutting of 8" dia M.S pipe for fabrication of half bend (8 Nos x 3 x 25.14")
Repair to 20000 GPH x 250 meter head HC pump set alongwith allied works at pumping station Dibber.
... extraction of damaged tie rods, shaft, impellers, bearings and diffuser etc. Providing, fabrication and fitting of new pump shaft as per sample. Providing, fabrication and fitting of new impeller 02 nos., fabrication /fitting of neck rings 2 nos., diffusers 1no., shaft protection sleeve 2nos. with check ...
Construction of 4.50M dia infiltration well to a depthof 9m at Puttuthakku Panchayat (Palar River)
Reinforced cement concrete M 30 Concrete using machine crushed HBG stone jelly excluding cost of centering, strutting, supply and fabrication of steel reinforcement but including cost of curing etc complete well curb,Triangular Portion,Binding Ring,Pilasters,Deduct for binding ring,Roof slab 100mm thick,Area = 3.14 X 4.402/4 = 15.20m2,Deduct for manhole cover
Providing New RCC Culverts at Ward No.22 Rathakrishnan Colony Thiruthangal Area in Sivakasi City Municipal Corporation
Supplying and fabrication of steel for all RCC works including cost of steel, binding wire and labour charges and fabrication and placing in position etc., complete as per standard specification.
Construction of Storm water drain at 129001S005 Sukkiravar patti 7th Cross Street, 129001S006 Sukkiravar patti 8th Cross Street, 129001S007 Sukkiravar patti 9th Cross Street, 129001S008 Sukkiravar patti 10th Cross Street, 129001S001 Sukkiravar patti
Supplying and fabrication of steel for all RCC works including cost of steel, binding wire and labour charges and fabrication and placing in position etc., complete as per standard specification.
Deepening, bund Strengthening, Fencing and Lighting AToe wall, stone pitching at Sumangali Kulam in ward 48
Supply and fabrication of steel using TMT & RTS bars with including cost and conveyance of all materials and including all labour charges etc complete