Loading…
Loading…
10,186 results • Best match
Annual Repair Mtc. of E.I. for Govt. Ayurvedic College/Hospital at village Patikara (Narnaul) for the year 2024-25 (Ayurvedic building) (Pdg. day to day maintenance materials)
Operation and Maintenance of Effluent/Sewage Treatment Plant - OPERATION AND SERVICE OF ETP FOR SEASON 2026 27; OPERATION AND SERVICE OF ETP; Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant - OPERATION AND SERVICE OF ETP FOR SEASON 2026 27; OPERATION AND SERVICE OF ETP; Under AMC and functional
Operation and comprehensive maintenance contract of centralized HVAC systeminstalled at SJICR, KRS road, Mysuru
Taking Out Filter Media Top layer to Bottom layer and replacing the same after washed, cleaned and screened at Water Works Dhangar, Reconstruction of Boundary wall of Boosting Station Dhangar
H.S.R. Item:-DNIT Name : Annual maintenance water supply scheme Dhangar “Taking Out Filter Media Top layer to Bottom layer and replacing the same after washed, cleaned and screened at Water Works Dhangar and Reconstruction of Boundary wall of Boosting Station Dhangar and all other works contingent thereto”
Comprehensive Repair and maintenance ( For Balance work including anticipated Qty. for One Year) to various roads under Division South East Road-1, PWD during 2026-27 (SH- Construction/ Repair of all components i.e Footpath, Drain, Central verge, MS
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Day to day annual operation, repair and maintenance of Rising Main and Distribution System for different zones at Amlamethi W/S Scheme under Canning Sub Division of Alipore Division, PHE Dte. (For 365 days) (2nd Call)
Operation and Maintenance of distribution system and Rising main pipeline (CI/DI/AC/UPVC/HDPE) (For 365 days) including Opening & closing of all the different dia Sluice Valves (80 mm dia to 350 mm dia) on different places along the alignment of the rising main and distribution main at different places over the command area daily as and when required for regulating the supply of water and distributing' water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap / plug of wash out point or opening the sluice valves including de-jointing flange joints (80 mm to 350 mm dia) including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [labour charges for operation and guarding of pump / valve/ disinfection arrangement with all accessories @ Rs. 487/ day / person + add bonus @ 8.33% i.e; Rs. 40.57 / day / person = total Rs. 527.57 + overhaed Expenses @ 5% i.e; Rs. 24.35+ Contractor's profit @ 10% i.e; Rs. 52.76 = Rs. 604.57 + ESIC contribution of employers @ 3.25% on labour charges i.e; Rs. 15.83 + EPF contribution of employers @ 13% on labour charges i.e; Rs. 63.31 = Total Rs. 683.81 say, Rs. 684.00 ] [N.B.: - i) Details scope of work and rates and measurement will be made as per Annexure - I ii) Any maintenance work carried out which is not included in the scop of work in Annexure-I (enclosed) may be done considering rates as per currend PHE / PWD SOR./SE/SWC] iii) The total amount inclusive of all duties and taxes. [For 365 days] Annexure - A