Loading…
Loading…
421 results • Best match
Laying of 11KV 3X185sqmm XLPE cable through micro tunneling with HDPE pipe of RL 500 mtr and other allied works regarding INSTALLATION OF NEW 02 NOS 160 KVA DTR
Gis survey
Erection works i.e. 1. Laying of 11 KV 300 sqmm XLPE UG cable through Micro-tunnelling, 2. Supply and fixing of 300 sqmm OD and Str.Thr jointing kits, 3. Fixing of LA, etc. at Birnagar 33/11 KV sub-station under Ranaghat Division.
GIS Survey
Selection of agency to provide Consultancy Service for Establishment and Operationalisation of State Level Technical Cell SLTC and City Level Technical Cell CLTC under Pradhan Mantri Awas Yojana-Urban 2.0 in Odisha
1 Urban/ Town Planning Cum GIS Expert (Senior) itemH1Code1 0.000 Nos Excess(+) Full Conversion INR
Conversion of 11KV Contai-II Tedubi feeder to 11KV XLPE UGCable to vacate the land for construction of residential building at the permises of Jaharlal Singha Keshab Kumar Manna at Krishnachak under Contai Division WBSEDCL
GIS survey
Preparation of DPR for Construction of 2 nos of 3 Lanned Bridge parallel to each other and its approaches at the existing Garganda Bridge, near Birpara at km 2.20 of New NH 317 in the district of Alipurduar - 2nd call.
Preparation of Detailed Project Report (DPR) for Construction of 02(Two) nos of 3-Lanned Bridge parallel to each other and it’s approaches (at the existing Garganda Bridge, near Birpara) at km 2.2 of New NH 317 in the district of Alipurduar, West Bengal, during the year 2025-26. Scope of work includes: 1. Hydrological survey of catchment area up to a suitable distance U/S and D/S of the proposed alignment. 2. Soil investigation work with minimum depth of boring 40m each for 8nos. location (one at each foundation of structure). 3. Tree felling survey & preparation of tree felling schedule, Topographical survey of alignment, ROW survey & marking, obtaining necessary NOC, Utility Survey, making proposal for shifting the utility services with the concerned authority, estimation for cost for shifting the utility services (to be obtained from the concerned authority). 4. Preparation of Conceptual Design (Preparation of General Alignment Drawing, Fixing of vertical as well as horizontal alignment) and obtaining approval of the competent Authority. 5. Hydrological data and Discharge calculation 6. Vetting of GAD & waterways from I & W Department, Govt of West Bengal 7. Design of suitable Bridge Foundation, Substructure and superstructure, approach roads, preparation of working drawing as per IRC specifications and preparation of estimate including detailed BOQ as per NH schedule of rates on vogue (in case the item of rates are not available in state or central government schedule of rates, then the rates to be analyzed as per Standard Data Book, MoRTH/market rate as directed by the authority. 8. Design & Detailing of protection works as per IRC specification. 9. Utility shifting estimate to be obtained from the concern Utility owning authority like WBSEDCL, PHE Department or any other authorities. 10. Preparation of land acquisition (LA) proposal & schedule, assisting the authority (by liaisoning) in land acquisition process. 11. Conducting a traffic survey for assessing the traffic volume for a period of 24 X 7 days and submission of comprehensive report.
Zonal wise survey of unauthorised/encroached construction in Akola Municipal Corporation area, preparation of unauthorised constructions files, surving notices to unauthorised constructions of whether construction proposal has been submitted for revi
i) शहरातील अनधिकृत बांधकामांचा झोन निहाय सर्व्हे करणे ii)नगर रचना विभागाच्या सहाय्याने अनधिकृत बांधकामाबाबतची कार्यालयीन नस्ती तयार करणे iii) निर्धारीत केलेल्या अनधिकृत बांधकामास नोटीस बजावणे iv) नोटीस बजावल्यानंतर सदर अनधिकृत बांधकाम धारकांनी सुधारीत बांधकाम परवानगी करिता प्रस्ताव सादर केला किंवा नाही याबाबत खात्री करुन प्रक्रीया पुर्ण करुन घेणे. v) सुधारीत बांधकाम परवानगी बाबत खात्री करतांना बांधकाम धारकांने अनधिकृत बांधकामा बाबत दंडाचा भरणा केल्याबाबत प्रक्रीया पुर्ण करुन घेणे व सर्व माहिती GIS वर अद्यावत करणे