Loading…
Loading…
1,833 results • Best match
CA NO CE CHZ AMB T 25 2025 26 PROVN OF KLP ACCN OF AD REGT SELF PROPELLED INCL AFFILIATED WKSP AT AMBALA CANTT PHASE II
Supply and mixing properly manure /cow dung with the excavated earth to make mixture of earth and manure to a ratio of 2:1 and surface dressing the area to a true level and required slope for grass plantation or to make plant/flower bebs.
REFILLING OF EARTHWORK, BLAST PENS WITH CONNECTING WORK AND CERTAIN B/R WORKS IN TECH AREA AT AF STN AMBALA UNDER GE (AF) AMBALA
Cleaning of dust Removal of all loose existing bituminous material manually and with heat torch gun to get smooth plain finished surface including removing of vegetation/plantation with no loose material on surface. Repair all joints and cracks with Highly elastic Bituminous cold applied putty of Tarplastic having penetration after setting upto 8mm. Levelling of surface to give proper slope will be done as per site requirements with Shalipatch or equivalent make of approved by GE cold applied, Bituminous Mortar & Cold Emulsion cum waterproofing Liquid of Shalikote-T-10 or equivalent make of approved by GE, Created SSD condition on surface with water. Prime the surface with Tarfelt LM or equivalent make of approved by GE mixed with portable water in the ration of 1 :1 and apply @400gm per Sqm (As per Surface Conditions). . Apply first coat of Tarfelt LM or equivalent make of approved by GE having elongation 200% conforming to ASTM-C-412 & having crack bridging of 8mm confirming to ASTM-C-836 with tensile strength after 7 days 0.50 mm conforming to ASTM-C-412 with no diluation of water on primed surface while the surface is still tacky with consumption of 700gm per Sqm. . Lay Geotex of 45 GSM/ Fibre mesh simultaneously and paste it properly with overlap of 50mm. . Allow the first coat to dry for 10 to 12 Hrs. . Apply 2nd coat on cured first coat with consumption @ 700gm per Sqm in opposite direction of first coat by Brush or Roller. . Allow it to dry for 10-12 hrs after apply 3rd coat with consumption @ 700gm per Sqm.Ensure final curing time of 36 hrs before allowing/ carrying out any further work. Conduct ponding test after min 7 day applying two coats of U V Resistant Elastomeric Exterior Acrylic Weather resistant water proof coating of Shalicryl-215 or equivalent make of approved by GE having elongation of 300% after curing of 14 days confirming to ASTM D- 6083-- for U V Protection of Bituminous Elastomeric Acrylic Emulsified Liquid Membranc of Tarfelt LM or equivalent make of approved by GE to give long life and prevent its deterioration from sunlight. Note:- Application of water proofing treatment will be done by Authorised Applicator only.
Providing Storm Water Drains Integrated with Waterbodies in Hosur City Municipal Corporation - Package-1
Plantation of trees and landscaping works after the completion of the construction activity
Carrying out Zone works for period ending 30.06.2027 on Zone No.-18 MHA (inc.) KM. 253/0 to MSN(Ex).
B-Item of CPWD HORTICULTURE DSR 2020 50000.00 Below/P
Carrying out Zone works for period ending 30.06.2027 on Zone No-14 Patiali(Excl.) to Fatehgarh(Excl).
B-Item of CPWD HORTICULTURE DSR 2020 100000.00 Below/P
Maintenance of trees shrubs and lawn in parks green belts and internal road in pocket-A,B,C,D,E,F of sector 02 including civil work for two years, Greater Noida.
Complete maintenance of the entire Garden featured having as per yard stick in the garden area ie. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing wedding, pruning, replacement of palnts gap filing, watering, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste, applying in secticide, pesticide & fertilizer, (Whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer, insecticide, pesticide will be provided by constractor) and as per direction officers in charge. 100077.00X24 = 2401848.00 Months