Loading…
Loading…
947 results • Best match
Construction of Block Level Stadium (With Indoor Hall) in Kalimela Block under Malkangiri District.
Design, manufacture, supply, installation, testing and commissioning of the following OUTDOOR TYPE cubicle type, wall mounted control panels including anchoring into the wall, wiring and earthing terminating into MPCB in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop / Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System, single phase preventer (Electronics type) as per the ratings given below. Terminal block for power distribution, Power Contactor.Phase indicating lights and indicating light for ON/OFF/TRIP status phase sequence relay shall also be provided.96 mm x 96 mm digital voltmeter and ammeter with selector switches. Suitable rating starter required as a bypass arrangement in case of VFD failure.Time delay relay for delayed automatic restart of air handling unit motor.(0-180 Sec). Make of switchgear-Legrand/ABB/Siemens/Schneider Make of VFD-HVAC Series of Siemens/Schneider/ABB/DANFOSS Wiring for microswitch for starting / stopping the fan when fire damper closes / Power supply for fire damper control panel. For on/off/remote and local operation, 3 pole single throw switch shall be provided in each ventilation fan panel to facilitate override of the automatic operation. All starters shall be provided with suitable potential free contract for connections to the Building Automation System. The number of AHU control panels shall be as follows. 63 TPN MPCB with 7.5 HP Three phase Motor with Star Delta Starter. Each of these compartment shall contain indicating lamp with ON/ OFF/ TRIP status of the motors. (Cost of VFD is part of Panel)
Construction of Block Level Stadium (With Indoor Hall) in Khairaput Block under Malkangiri District.
Design, manufacture, supply, installation, testing and commissioning of the following OUTDOOR TYPE cubicle type, wall mounted control panels including anchoring into the wall, wiring and earthing terminating into MPCB in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop / Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System, single phase preventer (Electronics type) as per the ratings given below. Terminal block for power distribution, Power Contactor.Phase indicating lights and indicating light for ON/OFF/TRIP status phase sequence relay shall also be provided.96 mm x 96 mm digital voltmeter and ammeter with selector switches. Suitable rating starter required as a bypass arrangement in case of VFD failure.Time delay relay for delayed automatic restart of air handling unit motor.(0-180 Sec). Make of switchgear-Legrand/ABB/Siemens/Schneider Make of VFD-HVAC Series of Siemens/Schneider/ABB/DANFOSS Wiring for microswitch for starting / stopping the fan when fire damper closes / Power supply for fire damper control panel. For on/off/remote and local operation, 3 pole single throw switch shall be provided in each ventilation fan panel to facilitate override of the automatic operation. All starters shall be provided with suitable potential free contract for connections to the Building Automation System. The number of AHU control panels shall be as follows. 63 TPN MPCB with 7.5 HP Three phase Motor with Star Delta Starter. Each of these compartment shall contain indicating lamp with ON/ OFF/ TRIP status of the motors. (Cost of VFD is part of Panel)
Construction of Block Level Stadium with Indoor Hall in Kishorenagar Block under Angul District.
Design, manufacture, supply, installation, testing and commissioning of the following OUTDOOR TYPE cubicle type, wall mounted control panels including anchoring into the wall, wiring and earthing terminating into MPCB in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop / Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System, single phase preventer (Electronics type) as per the ratings given below. Terminal block for power distribution, Power Contactor.Phase indicating lights and indicating light for ON/OFF/TRIP status phase sequence relay shall also be provided.96 mm x 96 mm digital voltmeter and ammeter with selector switches. Suitable rating starter required as a bypass arrangement in case of VFD failure.Time delay relay for delayed automatic restart of air handling unit motor.(0-180 Sec). Make of switchgear-Legrand/ABB/Siemens/Schneider Make of VFD-HVAC Series of Siemens/Schneider/ABB/DANFOSS Wiring for microswitch for starting / stopping the fan when fire damper closes / Power supply for fire damper control panel. For on/off/remote and local operation, 3 pole single throw switch shall be provided in each ventilation fan panel to facilitate override of the automatic operation. All starters shall be provided with suitable potential free contract for connections to the Building Automation System. The number of AHU control panels shall be as follows. 63 TPN MPCB with 7.5 HP Three phase Motor with Star Delta Starter. Each of these compartment shall contain indicating lamp with ON/ OFF/ TRIP status of the motors. (Cost of VFD is part of Panel)
Construction of Block Level Stadium with Indoor Hall in Chhendipada Block under Angul District.
Design, manufacture, supply, installation, testing and commissioning of the following OUTDOOR TYPE cubicle type, wall mounted control panels including anchoring into the wall, wiring and earthing terminating into MPCB in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop / Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System, single phase preventer (Electronics type) as per the ratings given below. Terminal block for power distribution, Power Contactor.Phase indicating lights and indicating light for ON/OFF/TRIP status phase sequence relay shall also be provided.96 mm x 96 mm digital voltmeter and ammeter with selector switches. Suitable rating starter required as a bypass arrangement in case of VFD failure.Time delay relay for delayed automatic restart of air handling unit motor.(0-180 Sec). Make of switchgear-Legrand/ABB/Siemens/Schneider Make of VFD-HVAC Series of Siemens/Schneider/ABB/DANFOSS Wiring for microswitch for starting / stopping the fan when fire damper closes / Power supply for fire damper control panel. For on/off/remote and local operation, 3 pole single throw switch shall be provided in each ventilation fan panel to facilitate override of the automatic operation. All starters shall be provided with suitable potential free contract for connections to the Building Automation System. The number of AHU control panels shall be as follows. 63 TPN MPCB with 7.5 HP Three phase Motor with Star Delta Starter. Each of these compartment shall contain indicating lamp with ON/ OFF/ TRIP status of the motors. (Cost of VFD is part of Panel)
.
All HVAC equipment shall be compatible with BMS and necessary provisions to be made in each panel.
Civil, Interior and MEP Works for revamping of Restroom at T3
HVAC Supply, Fabrication, Installation and testing of 120GSM Galvanised Sheet Steel metal ducts (FACTORY FABRICATED DUCTS) in accordance with the approved shop drawings complete with all accessories like vanes, flanges, suspension rods, anchor bolts, GI bolts & nuts, canvas connections, duct dampers & splitter dampers etc., and as required by the specifications. All size duct should be with TDF / duct mate joints. The gauges shall to be as per SMACNA standards. 24 Guage Galvanised sheet steel