Loading…
Loading…
947 results • Best match
Revival, Testing and Commissioning of BCG Block HVAC System at IVC facility at HLL biotech limited, Chengalpattu, Tamil Nadu
Vendor to conduct the following tests and validate the HVAC system 1.HVAC Testing, Adjusting and Balancing as per ASHRAE standard (Air side & Water side). 2.Checking and Recording all the parameters in TAB format for the equipments like: Air Handling Units. This to includes Electrical measures (Frequency, Power factor & Kw.), Hydronic flow measures, Pressures across heat exchangers (Water & Air), Airflow measures, Motor RPM measures & Thermal measure. 3. Water balancing of chilled/hot water system including: 4.Programming, Documentation, Simulation & Commissioning of BAS 5.Cleanroom Performance Testing, Adjusting, Balancing and Recording, As per DQ confirming 1S0-14644 Part - 3. Clean room validation to be done both at at rest & in operation conditions. a.Air balancing with Flow Hood b.Room Temperature & Humidity Test c.Room Pressure Balancing d.HEPA Filter Integrity Test e.Particle count test f.Room Recovery Test g.Airflow Visualization Test Providing all documentation of IOQ (at rest & in operation) in HBL approved formats *For Cold Room AHU (CAHU) - Temperature Mapping to be performed
Comprehensive Annual Maintenance Contract (CAMC) of Chillers and Allied HVAC Systems including BMS at Sahya Building for a period of 3 years at Sahya Building, Cyberpark, Kozhikode
Cost for the Comprehensive AMC of Low Side HVAC systems installed in the Sahya Building, Cyberpark including the Cooling Towers, Chiller related Pumps, VFD panel, Treated Fresh Air Units, Ceiling Suspended Units, HRW, Scrubber, VRF/VRV Systems etc. complete. The quote must include the Cost for carrying out routine service/maintenance and break down repairs as and when required to ensure trouble free operation of HVAC plant, various types of AC units and system related to the HVAC. The repair and replacement scope to be carried out is as detailed in the Tender Document. For the First Year.
Daily Operation Routine Maintenance and Comprehensive Annual Maintenance of 300 TR HVAC System at Science Exploration Hall of Science City Kolkata
Daily Operation, Routine Maintenance and Comprehensive Annual Maintenance of 300 TR HVAC System consisting of 3 Nos. Air-Cooled Packaged Screw Chillers of 100 TR each, Screw Compressors, Air-cooled Condenser, Chilled Water pumps, AHUs, chilled water piping with all the valves, ducting, electrical panels, VFD panel of secondary chiller pumps and other associated equipment of the central air conditioning plant of Science Exploration Hall of Science City, Kolkata
Construction of office Building of Punjab National Bank at IT Park, Dehradun including Development work, Water supply, Sanitary Installation, Sewerage system, Internal EI, HVAC, Lifts and Substation. (SH:- Pdg. Integration of metering system in ... E&M services in ... BMS system ). ... BMS system
the work of repairing sifting and re installation of hvac system along with accessories in medical store and o t at maa hospital
eProcurement System Government of Maharashtra Created By: Prashant Doke Created Date/Time: 11-Jun-2026 03:50 PM Tender Title: the work of reparing, shifting and reinstallation of hvac system along with accessories in medical store and o t at maa hospital, chembur east Tender ID: 2026_MCGM_1305576_1
Repairing and replacement of damaged/ rust out Duct, AHU, MS Pipe etc. of HVAC System at Saket Sports Complex.