HVAC Work in Mini secretariat Building Baran.
eProcurement System Government of Rajasthan Created By: Rachit Sharma Created Date/Time: 08-Jan-2026 05:04 PM Tender Title: HVAC Work in Mini secretariat Building Baran. Tender ID: 2025_CEPWD_522530_1
ADDN ALTN TO CLEAN ROOM AND AUGMENTATION AND RENEWAL OF HVAC PLANT OF CLEAN ROOM AGAINST BER HVAC PLANT AT AGRA
(U) ELECTRICAL WORKS :- Designing, supplying, Installation, Testing & commissioning of cubical type floor mounted front operated Main HVAC electrical /control panels-3 No for AHU electrical Control panels and 1x Main Panel as per site requirement (CPRI tested) confirming to IEC- 61439 & IS – 8623 suitable for 415V, 3 Phases, 4 Wire 50 Hz AC supply system fabricated in compartmentalized design with CRCA sheet street of 2mm thick for frame work and covers, 3mm thick for gland powder coating in approved shade, having required Amp, capacity extensible type TPN Aluminum Alloy bus bars suitable rating Neutral of high conductivity, DMC/ SMC bus bar supports, with short circuit withstand capacity of 35kA for 1 sec, bottom base channel of MS section not less than 100mm x 75mm x 5mm thick, fabrication shall be done in transportable section, of suitable rating 04 Nos Al Bus bar interconnection & and control wiring including the cost of connection through bus bar / copper conductor flexible connection with necessary interlocking as per requirement with PVC insulated FRLS copper conductor Single Core cable, cable alleys, cable gland plates in two half, including providing switch gears as per design and approved by Engr-in- charge/GE.
Construction of Centre for NCDC (National Centre for Disease Control) Lucknow Main Block including internal water supply Sanitary Installation, Drainage, Development works Electrical internal installations Fire Alarm and Fire Fighting System, Lifts, ... Set, HVAC , ... generation system LAN, ...
Civil, Electrical, Plumbing, Fire, ELV, HVAC, STP etc
25.2:Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including: b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment , including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass. d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineerin- Charge. Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub-head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up to two decimal places. Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payable separately. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NBL Certified laboratories 1. Performance Laboratory Test for Air Leakage Test (-50pa to ? 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr? 2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.? 3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01-05 testing method for a range upto 2000 ml? 4. Structural Performance Deflection and deformation by static air pressure test (1.5 times desing wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm? 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test? Tests to be conducted on site 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi) upto 2000ml?
Facility Management of HVAC Installations at MLCP East and West at CIA SH Repair works of HVAC Installations at MLCP East and West
Servicing of 33 kW , 3 phase, 415 V VFD of make ABB model: ACS560-01-062A-4 including dismantling from site, making the unit serviceable and refixing the same.
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR 01 YEAR WITH THE DEPLOYMENT OF 01 (ONE) NO. SKILLED TECHNICIAN AT APL SITE FOR TOTAL 275 TR AIR COOLED DUCTED PACKAGE AIR CONDITIONING SYSTEM (HVAC), MAKE BLUE STAR SUPPLIED INSTALLED BY ADV VENTILATION