Loading…
Loading…
948 results • Best match
TYPE I QTR. (S plus 5), MORGUE, KITCHEN/SH.BUILDING PORTION INCLUDING INTERNAL WATER SUPPLY AND SANITARY INSTALLATION, SEWAGE AND DRAINAGE WORKS, INTERNAL ROAD, BOUNDARY WALL, ELECTRIFICATION WORKS, FIRE FIGHTING , MGPS, LIFTS, HVAC ETC
Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/ beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured.
RMO of EI and fans in District Court Complex, Saket, New Delhi. (SH Annual Comprehensive maintenance and operation of HVAC Plant of 5x400 TR Capacity Mcquay i.e. Daikin Make Central Air Conditioning Plant)
eTendering System Government of NCT of Delhi Created By: Sanjay Kumar Created Date/Time: 24-Dec-2025 06:32 PM Tender Title: RMO of EI and fans in District Court Complex, Saket, New Delhi. (SH Annual Comprehensive maintenance and operation of HVAC Plant of 5x400 TR Capacity Mcquay i.e. Daikin Make Central Air Conditioning Plant) Tender ID: 2025_PWD_282821_1
Replacement of ducts and diffusers inside the corridor area at Level 2 ATC Connecting to the floor mounted AHU installed inside Room No 207 PGIMER Chandigarh Composite Work SH HVAC Work Elect Work
2 way valve (PN-16) with actuator and temperature controller (INSULATED)Supply, Installation Testing and Commissioning of following sizes electronic, self-balancing, dynamic balancing valve with integrated 2 way modulating control valve in a single body. The actuator shall be capable of accepting upto 10 V DC and upto 20 mA electric signal and shall provide similar transducer feedback output to control system. Maximum close off pressure shall not be less than 6 Bar for upto 50 mm valves and 7 Bar for 65 mm & above. Valves should have pressure rating of 25 Bar minimum.
E-TENDER FOR SITC OF NEW 8.5 TR DUCTED SPLIT AC ODU AND DISMANTILING OF EXISTING 8.5 TR HVAC ODU AT KAIRALI SREE THEATRE, OPP. KSRTC BUS TERMINAL,POLPAYAMANA,TAZHEKKOD, KOZHIKODE ,KERALA 673004
HVAC WORKS
Renovation of 6th & 7th floor of existing old ward building C Block for setup of labs tutorial rooms and faculty rooms at ESIC Model Hospital Basaidarapur New Delhi (Civil Electrical HVAC ducting works.
SITC of 350TR Cooling tower in place of old and worn out cooling towers of HVAC plant at Madurai Airport. SH Replacement of 02 nos. cooling towers, pumps, starters, VFD etc. Phase II.
Cooling Tower SITC of FRP INDUCED DRAFT COOLING TOWERS for air conditioning system. Each tower shall be complete with basin, casing, distribution system, filling, louvers,HDG supporters, SS nut bolts, GI / aluminium ladder, fan and motor including modification of PCC / RCC foundation as required. Efficiency of Motor (class IE3) as per IS 12615. Motor shall be suitable for 415±10% volts, 50 cycles, 3 phase power supply, Isolator panel with MCCB and emergency poweroff push button (EPO) at cooling tower and earthing, shall also be included. Tower for airconditioning system shall be selected on the basis of ambient wet bulb 25.56 deg C. The cooling tower shall be CTI certified. The cooling tower shall be IP 55 and VFD / VSD controled. Cooling tower suitable for minimum 330 TR Screw chillers having flow rate of 865.43 USGPM, inlet temperature of 35 deg C and outlet temperature of 30 deg C having heat rejection capacity minimum 20 % extra against 330 TR chiller. (Colour of cooling tower shall be as per AAI approval.) Note: Range shall be 4.2 deg C and wet bulb approach shall be 2.77 deg C Existing concrete basement size - 4.75 mtr X 4.70 mtr, cooling tower sizes to be matched with the same.