Loading…
Loading…
3,466 results • Best match
BOQ
Carriage of Sand from Source to site of work by Mechanical transport including loading /Unloading complete for an avg dince of 120 km by MT
REPAIR TO CERTAIN ROADS AND REPLACEMENT OF ROAD FURNITURE TO PERIMETER AND INSIDE DEPOT AREA AT ARMY AREA BANAR UNDER GE BANAR
M&L for applying evenly a prime coat of catonic bitumen emulsion SS1 confirming to IS: 8887 at a rate of application of 0.70-1kg/sqm on surface of WMM/WBM as specified in table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer complete all as specified and directed by Engr-in-charges.
Execution of work under Raising the height of existing boundary wall and provision of conertina coil over the top of the MS grill panels at Ancient Site Ropar, Punjab
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead.
Major Repair Work of School Building GUPS Sanskrit Kotda Kunj Block Bakani Dist Jhalawar
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Annual Maintenance shut-down of wheel shop equipments for 2026-27 (Maintenance WFPS)-Group-8.
B-Normalising furnace - Mechanical work (Rates are inclusive of GST)
Maintenance Work
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar