Loading…
Loading…
2,661 results • Best match
Construction of New Building For Farmer Training Centre at Panwadi, Tapi-Vyara Dist. Tapi
258 Providing , erecting , fabricating the M.S. structure as per requirement on site 47.00 Kg. 77.77
Construction of Boys Hostel Building with Canteen for Tribal Development at Jamnagar.
166 Providing , erecting , fabricating the M.S. structure as per 190.00 Kg 77.77
Work of Bus strengthening at various 66KV S/S -66KV Shivrajpur S/S, 66KV Sinor S/S, 66KV Kosindra S/S under Bodeli AM Transmission Jambuva circle, approved under R&M 2025-26
to the tilting angle 20 degree available with luminaries it self & supporting pipe should be fabricated & welded
Work of 1) Bus strengthening from single Panther conductor to twin zebra conductor approved under R&M 2020-21 at 66 KV Subhanpura S/S , 2) Re-arrangement of various 66kV Line bays, erection of middle CPB-3 with erection of sectional isolator, ... special work R ... M Plan 2023-24 ...
to the tilting angle 20 degree available with luminaries it self & supporting pipe should be fabricated & welded
SA Div: Provision for Rubberized pad at LCs, line count-28 nos.
... rate includes with earth work by Driven mechanism or auger mechanism, materials, ...
Tender for Work of Erection, Commissioning, Transportation, Loading & Unloading of 66kV equipments with structure, stringing of 2nd 66kV Bus (twin zebra) and earth wire, providing jumpers etc. and Dismantling of existing 66kV Auxiliary bus, jumpers, ... wire, structure , ... R&M plan 2024-25
M.K.Box cabling on structure including required fabrication.
New Construction of UG and PG Hostel Building at GMERS Medical College Valsad, Ta.Dist. Valsad.
Providing , erecting , fabricating the M.S. structure as per requirement on site and Paisa Seventy Seven
Supply of Cassette AC for Service Building Engineers Offices of GTPS.
(7) Item-7: Providing , erecting , fabricating the M.S. structure as per requirement
Replacement of Rusted Cantilevers, anti creep, overaged insulators and composite insulators in BZA division.
SUPPLY/MATERIAL Total 793044.00 Item- 18 3(bs)Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts S No. Item Description of Item Unit Qty Rate Amount No
Replacement of existing PSC Girder with new PSC Slab at Major Bridge No. 4 (3x12.20 m PSC Girder) in CLF-MZH Bypass line including earthwork in bank/cutting, cess, trolley refuse and other protection work under the jurisdiction of Assistant Divisional Engineer Manendragarh of Bilaspur Division.
Assembling & Erection of fabricated MT steel structure/CC Cribs for stacking/staging ...