Loading…
Loading…
18,990 results • Best match
NCTPS I SE MI Circle AMC 26 27 BM Dn Unit I II III On line arresting of steam/ Boiler feed Water leaks in HP LP valves MS and RH spray line valves and sampling line valve glands flanges and bonnet in Boiler by ON LINE LEAK ARRESTING METHOD
Arresting of steam leak in Pipe welding joints, Pin hole Puncture, Cracks etc., by On Line Sealing method In the following size Up to 50mm O.D. Pipe. Including consumables and T&P's.
NCTPS I SE MI circle AMC 25 26 BM Dn Unit III Attending Routine breakdown maintenance works in Water Wall Soot blowers for a period of one year from the date of taking over of site
Charges for attending break down maintenance in water wall soot blower by Removal of swivel tube from the Boiler inner side to outer side using chain block arrangement, inspection of internals, changing the worn out/damaged chain, springs, Motors, gland, gaskets etc., fixing, aligning, re-assembling and recommissioning including lead, lift. Including cost of consumables, T&P's.
Facility Management Services - LumpSum Based - Workshop, Mines; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
Mines; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Coal Mines; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Coal Mines; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
MOEI & Fans i/c DG Set at Weavers Service Centre Bemina during 2025-26 SH Annual maintenance of Electrical & Mechanical installation
Central Public Works Department
MTPS I TM Unit I Removal and Reinsulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
Removal and Re-insulation of LPT Gland steam pipes: Removal of LP front & Rear gland steam pipes insulation, re-insulation, Aluminium cladding after fixing of LP front & rear gland steam pipes etc.