NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Inlet A B Pass Patch up welding work for damaged flue gas duct portion from Mech Hopper top expansion joint to ESP inlet expansion joint ie before splitter assembly
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing... positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Inlet C D Pass Patch up welding work for damaged flue gas duct portion from Mech Hopper top expansion joint to ESP inlet expansion joint ie before splitter assembly
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing... positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Removal relaying boiler Insulation and its accessories in Burner corner windbox pent house 1st pass Drum encloser WWSB Dockhouse Eco ring header S panel 2nd pass Dockhouse
Removal and Relaying of MS corrugated cladding Sheets: This work involves Cutting and removal of the existing M.S Corrugated sheets, fixing of new/old sheets, welding with channel of boiler structure. Charges inclusive of consumables and hire charges for T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Overhaul of ID fans during Annual Overhaul for the year 2025 26
Overhaul of Lube oil Lines: Drain the working oil, dismantle the oil lines. Draining oil from coolers, opening the end covers. Dismantle the NRVs in AOP and MOP end inspection, cleaning and refixing. Box up the oil lines with proper gaskets after completion of all works and fill the working oil. Trial run of AOP. Including drawl, devolution, transportation, cost of consumables and T&P's.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Rectification Renewal of PA fan cold air duct portions at 4 meter elevation and renewal of damaged expansion joint secondary air duct at APH out slope area during Annual Overhaul for the year 2025 26
Charges for Fabrication and Erection: work involves Fabrication and Erection of channel & supports, etc, of PA fan cold air duct portions from 4 meter elevation. (The Required Material will be supplied by Contractor) Including consumable and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Flue Gas Duct Renewal Rectification of flue gas duct portions from ID Outlet to before Chimney during Annual Overhaul 2025 26
Renewal of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing... positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow ...