NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Overhaul of PA fans and its PA fan lub oil system overhaul of LOP coolers and lines during annual overhaul for the year 2025 26
Overhaul of IGV Left and Right side and its gearbox: This work includes loosening of IGV casing bolts and removal of IGV assly. from fan casing. Dismantling... blades. Cleaning and checking the above internals for any defect and attending repair works and replace the wornout internals. Re assembling, retapping of grease nipple points, ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Overhaul of ESP 2 streams during annual overhaul for the year 2025 26
Reconditioning / Renewal of pocking pipes: Work involves cutting and removal of damaged pocking pipes, gauching, edge preparation, erection of new pocking one. Including drawal& devolution,Including cost and consumables. (The Required material will be supplied by TNPGCL)
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Overhaul of ID fans during Annual overhaul for the year 2025 26
Overhaul of Lub oil Lines : Drain the working oil, dismantle the oil lines. Draining oil from coolers, opening the end covers. Dismantle the NRVs in AOP and MOP end inspection, cleaning and refixing. Box up the oil lines with proper gaskets after completion of all works and fill the working oil. Trial run of AOP. Including drawl, devolution, transportation, cost of consumables and T&P's.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Providing cup lock metallic scaffolding arrangements inside the boiler furnace up to the radiant roof to facilitate for inspection and tube thickness survey in water wall and platen SH inspection
Providing Cup lock metallic scaffolding arrangements inside the boiler furnace upto the radiant roof & 1st pass slope, platen super heater of level 50mtr for Hydro Jet Cleaning of boiler tubes and dismantling the scaffolding after the work, includes hire charges for cup lock metallic scaffolding material, consumables and T&P’s etc., in 210 MW boiler Unit-III at NCTPS-I.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I II III Overhauling of HP LP valves in PRDS WWBS safety valves and renewal rectification of HP LP valves steam lines drain lines in PRDS station and its connecting drain lines to IBD tank
Charges for changing of defective pipe lines of PRDS By Pass valve, 100 Main valve, auxiliary header, MS. Spray Station, CRH spray station valves and pipe lines in PRDS floor tubes and valve size above 44.5mm OD Work involves transportation, cutting and removal of defective in existing pipe line and valves, edge/spool preparation, welding the valve with IBR welder. Including Consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III FD PA air ducts A B Pass Renewal Rectification of eroded damaged Duct wall and its supports Renewal Rectification of expansion joints during Annual Overhaul for the year 2025 26
Strengthening of steel supports (outside) for FD,PA fan delivery duct A & B pass below 9 Mtr elevation work involves fabrication and Erection of new M.S Channels for strengthening of additional steel supports. Including cost of consumables and T&P’s.