NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Conducting tube thickness survey in 1st pass Inter pass Boiler Drum Overhauling and renewal of defective tubes drain lines and Overhaul of boiler drums during Annual Overhaul 2025 26
Charges for cutting, edge preparation and welding of 1” pipe line, tee elbows, bends in Boiler pressure parts by IBR welder etc. at joints. Including consumable and hire charges for T&P's.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Flue Gas duct A Pass Rectification of flue gas duct portions from APH outlet to before Mechanical hopper area during Annual Overhaul for the year 2025 26
Renewal of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing... positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Annual Overhaul of Air Pre Heater B pass and its lube oil system during the year 2025 26
Charges for Providing platform and dismantling after completion of Expansion bellow cover plate and soot blower pipe erection work. Including Consumables and T&P’s.
NCTPS I SE MI Circle AOH COH 25 26 BM Dn Unit I Dismantling and refixing of 18 mtr spray station valve pipe line and impulse line cutting removal and including grinding edge preparation same to be welding stress relieving in the Spray station
Fabrication of special type heavy duty Fixtures for facilitating to dismantle the heavy size Maín... bonnet clamp, bonnet, split ring, packing, support ring and Gate disc during Capital overhaul.(a)Fabrication of special type heavy duty fixture for facilitating to dismantle the heavy size bonnet ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Providing of insulation for PA hot air duct and SA hot air duct APH outlet slope area of Flue gas duct A and B pass Renewal Rectification of overhauling work and relaying the insulation as original
Providing scaffolding for insulation work: Involves making scaffolding for insulation work in FG duct and dismantling the same after completion of work. Including hire charges for scaffolding pipes, consumables and T&P’s.
NCTPS I SEMI Circle AOH 25 26 BM Dn Unit I Providing cup lock metallic scaffolding arrangements inside the boiler furnace up to the radiant roof to facilitate for inspection tube thickness survey in water wall platen SH inspection
Providing Cup lock metallic scaffolding arrangements inside the boiler furnace upto the radiant roof & 1st pass slope, platen super heater of level 50mtr for Hydro Jet Cleaning of boiler tubes and dismantling the scaffolding after the work, includes hire charges for cup lock metallic scaffolding material, consumables and T&P’s etc., in 210 MW boiler Unit-1 at NCTPS-I.