NCTPS I SE MI circle AOH 25 26 BM Dn Unit II III Supply and Installation of Air Sealants in Penthouse of Unit II III to avoid ash leakage air ingression to the boiler during Annual Overhaul 2025 26
Removing of damaged / worn out air seal in 52 mtr for facilitating rectification work in penthouse area, this work involves complete removal of the damaged mesh, SS fastening bolts & screws, air seal ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Overhaul of PA fans and its PA fan lub oil system overhaul of LOP coolers and lines during annual overhaul for the year 2025 26
Overhaul of IGV Left and Right side and its gearbox: This work includes loosening of IGV casing bolts and removal of IGV assly. from fan casing. Dismantling... blades. Cleaning and checking the above internals for any defect and attending repair works and replace the wornout internals. Re assembling, retapping of grease nipple points, ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Renewal Rectification of Insulation in Air Pre Heater A and B Pass casing and its Auxiliaries and PRDS system including supply during Annual Overhaul for the year 2025 26
Clearing of released wool from the works spot: This work involves collection of released waste wool, debris and other unwanted insulation materials from the work spot, gathered in one place and clear, transport for away from the site as per the instruction of Engineer in-charge. Including consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Repair Rectification of eroded tubes in Economizer coil sagged coils and other allied works during Annual Overhaul 2025 26
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. Including consumable and hire charges for T&P's.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II FD and PA air ducts A and B Pass Renewal Rectification of eroded damaged duct wall and its supports Renewal of expansion joints during annual overhaul for the year 2025 26
... Metallic expansion joints size; 1534 x 1737 x 272mm, style #02, FS for PA hot air ductL&R: Work involves arresting the upstream and downstream of duct, cutting and removal of existing ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP bottom Hopper Reconditioning of damaged eroded portion of ESP bottom hopper patch up and strengthening works during annual overhaul for the year 2025 26
... be furnished. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of LRB wool, Iron & steel material and as per the... charge the materials will be supplied by TANGEDCO available at stores during execution of works)