Loading…
Loading…
18,989 results • Best match
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I Overhaul of ESP 2 streams during annual overhaul for the year 2025 26
Reconditioning / Renewal of pocking pipes: Work involves cutting and removal of damaged pocking pipes, gauching, edge preparation, erection of new pocking one. Including drawal& devolution,Including cost and consumables. (The Required material will be supplied by TNPGCL)
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Removal relaying boiler Insulation in boiler rear side and both left and right side corner from 24 mtr to 52 mtr during Annual Overhaul 2025 26
Removal and Relaying of MS corrugated cladding Sheets: This work involves Cutting and removal of the existing M.S Corrugated sheets, fixing of new/old sheets, welding with channel of boiler structure. Charges inclusive of consumables and hire charges for T&P’s.
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit III Supply and erection of Eco coil 8 Nos with supporting arrangement to renew heavily eroded Eco coil from coil no 144 to 136 right to left except 139 coil in phased manner
Charges for bending of various size of boiler tubes. Including consumable and hire charges for T&P's.
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I ID fans Renewal of ID fan 1A and 1B wornout impeller assembly dynamic balancing of shaft with impeller assembly during annual overhaul for the year 2025 26
Charges for fabrication of radial seals of ID fan 1A &1B the work involves: 3 mm plate cutting, grinding, making holes and bending to suit radial seal fixing frame at both DE / NDE side required materials issued by TNPGCL. Including consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Outlet A B Pass Patch up welding work for damaged flue gas duct portion from ESP outlet to before ID fan inlet during annual overhaul for the year 2025 26
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing... positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Renewal of Passing MSSV left by reconditioned MSSV valve including cutting grinding welding stress relieving and commissioning the valve during Annual Overhaul for the year 2025 26
... valve from stores to site and old valve from site to stores. Cutting, removal and re-erection of existing platforms, structural members at 52 M level. This work involves cutting, removal and re erection of existing platforms, structural members to facilitate movement of new & old valves ...