Loading…
Loading…
18,990 results • Best match
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Renewal of eroded and damaged Primary and Secondary GD screen sheets during annual overhaul for the year 2025 26
Charges for lifting ESP primary & secondary screen plates from ‘0’ mtr to ESP top elevation and re-erection, this work involves, additional support frames to be provided inside and outside ESP for fixing of screen sheet properly at ESP. Including cost of derrick arrangements, consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Removal relaying boiler Insulation and its accessories in Burner corner wind box pent house 1st pass Drum enclosure WWSB Dock house Eco ring header S panel and 2nd pass Dock house
Removal and Relaying of MS corrugated cladding Sheets: This work involves Cutting and removal of the existing M.S Corrugated sheets, fixing of new/old sheets, welding with channel of boiler structure. Charges inclusive of consumables and hire charges for T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Overhaul of ID fans during Annual Overhaul 2025 26
Overhaul of Lub oil Lines: Drain the working oil, dismantle the oil lines. Draining oil from coolers, opening the end covers. Dismantle the NRVs in AOP and MOP end inspection, cleaning and refixing. Box up the oil lines with proper gaskets after completion of all works and fill the working oil. Trial run of AOP. Including drawl, devolution, transportation, cost of consumables and T&P's.
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I Insulation Providing of insulation for Flue gas duct B pass from 3102 4054 272 mm Expansion joint to 15 mtr length along the direction of flue gas duct and ESP outlet C D pass to ID inlet ID fan
Providing scaffolding for insulation work: Involves making scaffolding for insulation work in FG duct and dismantling the same after completion of work. Including hire charges for scaffolding pipes, consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I II III Dismantling cleaning and rectification of defective dislocated boiler seal trough seal plates SS woven wire mesh providing patch plate and coating of LUMEROUS HR 47 inside boiler
Providing necessary temporary scaffolding arrangements in the Boiler bottom area upto 7.5mtrs Elevation all the four sides of the boiler for Dismantling, cleaning and Rectification of defective / dislocated boiler seal trough seal plates, and providing patch plate, and refixing of S.S woven wire mesh, ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Outlet C D Pass Patch up welding work for damaged flue gas duct portion from ESP outlet to before ID fan inlet during annual overhaul for the year 2025 26
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing... positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow ...