Loading…
Loading…
18,990 results • Best match
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Attending rectification and overhaul works in Gates and Dampers SAD 3 4 PAG 3 4 GG 5 to 16 and strengthening supporting structures during annual overhaul for the year 2025 26
Charges for fabrication, erection and strengthening of Damaged / eroded supporting structures in gates and damper. Inclusive Consumables and T&P’s. (Required structural material will be supplied by TNPGCL)
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Annual Overhaul of Air Pre Heater A pass and its lube oil system during the year 2025 26
Charges for Providing platform and dismantling after completion of Expansion bellow cover plate and soot blower pipe erection work. Including Consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Complete renewal of worn out damaged insulation casing wall at Boiler 2nd pass from 27 mtr elevation to pent house and side wall of dock house area during Annual Overhaul for the year 2025 26
Removal and Relaying of MS corrugated cladding Sheets: This work involves Cutting and removal of the existing M.S Corrugated sheets, fixing of new/old sheets, welding with channel of boiler structure. Charges inclusive of consumables and hire charges for T&P’s
NCTPS I SEMI circle AOH 25 26 BM Dn Unit I Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned coal nozzle and coal tips for Boiler burner overhaul for the year 2025 26
Reconditioning of defective coal nozzle: Charges for transportation of coal nozzle (SH) from central stores to work site. Inclusive of Transporting of defective coal nozzle, consumables and hire charges for T&P’s.
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I II III Overhauling rectification of boiler safety valves spray station control valves HP LP hand operated valves and safety valves floating during Annual overhaul for the year 2025 26
Overhauling of Boiler HP/LP valves : This overhauling involves dismantling, inspection, rectification of defects if any, lapping of valve seat ...
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Renewal of long term overheated HRH coil 9 Nos 33 to 41 during Annual Overhaul for the year 2025 26