NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I Insulation Providing of insulation for Flue gas duct A pass from 3102 4054 272 mm Expansion joint to 15 mtr length along the direction of flue gas duct ID fan casing A B and ESP outlet A B pass
Providing scaffolding for insulation work: Involves making scaffolding for insulation work in FG duct and dismantling the same after completion of work. Including hire charges for scaffolding pipes, consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Flue Gas duct B Pass Rectification of flue gas duct portions from APH outlet to before Mechanical hopper area and including expansion joint during Annual Overhaul for the year 2025 26
Cleaning the accumulated the ash in side of the flue gas ducts by opening the man hole doors and cleaning the ducts, collecting the accumulated ash in the Gunny bags, bringing to "0" meter at A pass side from APH outlet to before Mechanical hopper area. Including consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II ESP Renewal of eroded and damaged Primary and Secondary GD screen sheets during annual overhaul for the year 2025 26
Charges for lifting ESP primary & secondary screen plates from ‘0’ mtr to ESP top elevation and re-erection, this work involves, additional support frames to be provided inside and outside ESP for fixing of screen sheet properly at ESP. Including cost of derrick arrangements, consumables and T&P’s.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II III Attending rectification and Overhaul works in Gates and Dampers SAD 3 4 PAG 3 4 GG 5 to 16 and strengthening supporting structures during annual overhaul for the year 2025 26
Charges for fabrication, erection and strengthening of Damaged / eroded supporting structures in gates and damper. Inclusive Consumables and T&P’s. (Required structural material will be supplied by TNPGCL)
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Overhaul of FD fans during Annual Overhaul 2025 26
Charges for Strengthening of steel supports for FD fan outlet ducts A & B pass at 'O' mtr elevation work involves Fabrication and Erection of new M.S angles and channels for Strengthening of transition duct supports. Including all charges such as T&P's and consumables etc.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Removal relaying boiler Insulation and its accessories in Burner corner wind box pent house 1st pass Drum enclosure WWSB and rectification renewal of worn out damaged insulation in boiler
Removal and Relaying of MS corrugated cladding Sheets: This work involves Cutting and removal of the existing M.S Corrugated sheets, fixing of new/old sheets, welding with channel of boiler structure. Charges inclusive of consumables and hire charges for T&P’s