Loading…
Loading…
20,848 results • Best match
3LPE Coated Carbon Steel Pipeline laying and associated works for Krishnagiri (Group A).
"COMPLETE WORKS FOR TAP-OFF POINTS (NOT PART OF SV STATION COMMON VALVE CHAMBER) Works at Future Connections:Complete works of design, engineering, installation of all piping, valves, fittings at all depths insid e the pit in all types of terrains and soils/Strata. ...
3LPE Coated Carbon Steel Pipeline laying and associated works for Krishnagiri (Group B).
"COMPLETE WORKS FOR TAP-OFF POINTS (NOT PART OF SV STATION COMMON VALVE CHAMBER) Works at Future Connections:Complete works of design, engineering, installation of all piping, valves, fittings at all depths insid e the pit in all types of terrains and soils/Strata. ...
Extension of fire wall behind TLF at Durgapur BP
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars & disposal of unserviceable material outside site at unobjectionable place& as per direction of Engineer-in-charge
Repairs to Galvalume Fencing along the periphery of East Break Water at fishing harbour in view of IFR 2026
Structural steel fabrication work in single section , fixed with or without connecting plate, including cutting , hoisting , fixing in poistion and applying a priming coat of approved steel primer all complete.All labour and materials but excluding of steel.
Providing weather protection shade over main gate office area at ACTREC
Hiring Structural Consultant:The scope includes the structural design, detailing, and drawings for a Mild Steel (MS) roof shed to cover the DG sets ...
Providing Aluminium Cladding to Pithapuram Municipal Office Building of Pithapuram Municipality.
... cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on structural steel work including necessary accessories complete in all respects including all scaffolding and ...