Loading…
Loading…
20,785 results • Best match
Providing and Laying Sewer line and Construction of R/ Wall in front of Type-III C and D Block under Parimahal Section
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is ...
Upgradation of Footpath and Deep drain from Fire C.P.O. Panjtirthi to kachi chowani in Ward no.1.
Demolishing RCC work manually/by mechanical means including stacking of steel bars and disposal of unservicable material within 50m lead as per direction of engineer incharge
Repairing work of weir dam/diversion channel to ensure continuous water supply at Trout Fish Farm Hamni, Tehsil Banjar District Kullu (H.P.) SH Restoration of damages due to flood to intake weir across river Tirthan).
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains , including... disposal of surplus excavated soils as directed, within all lead .including river training works and carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge ...
Repair of collapsed compound wall of Manifit TE campus at Jamshedpur BA Jamshedpur
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.
Covering of drain near PM Shri Govt. High School, Digiana, Ward no 45, Jammu AC Bahu
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Annual Plan-93/2025-26-Construction of Compound wall and Laying interlock at Muzhakkom MCF in Kayyur cheemeni gp
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock