Loading…
Loading…
20,785 results • Best match
Annual Plan- Changaroth GP PRO.NO 293/25-26 Renovation of Anganvadies-.- General Civil Work
15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar
REPAIR/ REPLACEMENT AND MAINTANANCE OF 11 KV HT DISTRIBUTION SYSTEM UNDER GROUND HT LINE, VCB, TRANSFORMER AND ALLIED WORKS OF EXTERNAL ELECTRIFICATION AT AF STN NARELA, AF STN RAJOKRI AND AF STN ARJANGARH IN AOR OF GE (AF) GURGAON
... including using GI strip 25×4mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanized iron or steel, earth plate surrounded by packed layer of char coal dust and common salt, 15cm thick all around bottom and top and watering pipe 20mm bore ...
CERTAIN REPAIR AND MAINT OF VARIOUS TYPES OF TRANSFORMERS, VCBS AND MAINT OF HT OH LINE AND UG CABLE AND ALLIED WORKS OF ZONE B AND C AND REPAIR/REPLACEMENT OF DG SET INSTALLED OF ZONE B, ZONE C AND MODERNIZED COD AREA AND 506 ABW, AMC CAPSULE LIFT
... level, connected to galvanised iron strip 32x6mm by means of bolts, nuts, check nuts and washers of galvanised iron or steel, 40mm bore GI pipe light grade including necessary fittings for protection of earthing strip, watering pipe... pipe light grade including necessary fittings for protection of earthing strip, watering pipe 20mm bore GI medium grade, concrete chamber in PCC (1:4:8) type D-2 using 40 mm grade ...
Reconstruction - Strengthening of Existing Roads including Construction of allied structures under GPRA colony project in Sarojini Nagar area, New Delhi, including Operation and Maintenance for 2 years (PKG-XI)
necessary for the structural base of the shelters. Structural Fabrication:
Redevelopment of GPRA Colony at Netaji Nagar, New Delhi- SH: Construction of Roads including allied structures and services including 02 years Operation and Maintenance (PKG- III B)
concrete work necessary for the structural base of the shelters. Structural Fabrication:
Painting of Hoist bridge AND Trestle Columns and replacement of chq plates of hoist platform of Mundali Main Weir for the year 2025 26
Fabrication cost of structural steel materials for replacement of chq. plate of Hoist platform including 5% wastage material complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge.