Loading…
Loading…
21,020 results • Best match
building I MAINT.
15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar
Strengthening of Entry and Exit Portions of Weigh Bridges No. 07, 09, 10 and Boom Barrier at W/B-09 at Chhal OCM, Chhal Sub-Area.(2nd Call).
Dismantling and Demolishing: Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Cleaning of existing drain, culverts and cutting as well as cleaning of earth heaps and repairing of drain at DD unit complex under ROCP.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar
Annual Plan-Dharmadam GP 179/2025-26-Renovation of PHC, Dharmadam-General Civil Wor
15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar
GENERAL Providing retaining wall in Vadakkenada Pathanapuram road km between 0 000 to 0 200 and 2 000 to 2 900 Providing retaining wall in Vadakkenada Pathanapuram road km between 0 000 to 0 200 and 2 000 to 2 900 General C
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Second phase of farm road completion at SSF Perambra
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Reconstruction of boundary wall by way of providing RCC Columns Brick work and allied works (Rear portion) at FVSc and AH, R.S. Pura
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
Reconstruction of compound wall of D6 Quarters
15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar
39/2025-2026 Construction of compound wall for MCF building
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Construction work IN NPP LONI WORK NO 1
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar DSR NO. 15.7.4