Loading…
Loading…
21,043 results • Best match
Providing and laying UGD Pipeline and Construction of machinehole chambers at Dodda tayamma temple and pattaladamma temple Near by selected cross roads, Hebbal colony, Ward no.04, Mysuru
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.
Repairment of Compound wall at Chitterkote
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar.
GENERAL General Maintenance and Reconstruction of Tractor culvert and other allied works in Cherukunnam ela thodu in Chadayamangalam Grama PanchayathGeneral Civil Work
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
CONSTRUCTION OF SCHOOL DEVLOPMENT WORK AT GSSS BHOOTEDA, GOVINDGARH, JAIPUR
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge.
Construction of Road and Drain of AN Guha Lane Main Road, Ward No 26 under SMC Sambalpur Ward No 22
Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete.
Annual Maintenance Estimate of Hort. works in sector-3and5 and Main Water Works sec-3and5, Hisar for the year 2025-2026.
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar
GENERAL FDR Kayyor Chayoom Arayakkadav Road covering slab with drain 2 000 to 2 300 Civil work General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
DEPOSIT-Closing of front gate at IGMMRS Nilambur-Closing of front gate at IGMMRS Nilambur General Civil Work
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
Repair Restoration of GSR 50k Glns JK Colony and GSR 20k Glns Thather Paloura under JMC Capex
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Reconstruction of damaged compound wall.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar