Loading…
Loading…
665 results • Best match
Upgradation of CC Road and CC Drain at Balayogi Street and Masjid Street and Construction of CC Culverts at various locations of Jampeta in 32nd division in RMC.
Providing Plain Cement concrete (1:4:8) (Cement: fine aggregate: coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, on all materials including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc. complete for finished item of work (APSS No. 402).
Construction of Major RCC Drain and Internal CC Drains at Padmavathi Nagar in 10th division in RMC.
Providing Plain Cement concrete (1:4:8) (Cement: fine aggregate: coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, on all materials including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc. complete for finished item of work (APSS No. 402).
Construction of KGBV Hostel Type-III at Jai Kishan Higher Secondary School,Lakhna for the year 2025-26 (Building)
EXTERNAL PH WORK Sinking of 200mmx150mm dia Bore Well through DTH method.- 1No. Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation(G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only. Drilling of 200mm dia bore 0 to 30.00mtr
SITC of Fire fighting system including Aerosol based fire suppression system and Lightning arrestor to New CHC Pujaripada (Gplus1) Building under Umerkote Block, Nabarangpur Dist. during 2025-26
Construction of 1nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr
SITC of Fire fighting system including Aerosol based Fire suppression system and lightning arrester to New CHC Nandahandi (Gplus1) Building, Nabarangpur Dist. during 2025-26.
Construction of 1nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr
Peripheral Develpoment
Providing & laying factory made chamfered smooth edge cement concrete paver blocks of required strength, thickness & size/shape made by table vibrator method to attain superior smooth finish using PU or equavalent moulds laid in required gray colour & pattern over 50mm thick compacted bed of coarse sand , compacting and proper embeding / laying of inter locking paver blocks in to the sand bedding layer through vibrator compaction by using plate vibrator filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in foot path, parks, lawns, drive ways or light traffic parking etc. as per manufacurer's specification including cost, conveyance, taxes of all the materials excluding GST, required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.