Loading…
Loading…
2,023 results • Best match
goushala me tubewell nirman karya inyara
construction of tubewell up to 100 mtr depth in all type of rocks by dth systen and overburden to accommodate casing pipe of following sizes in all types of soils and overburdenincluding lowering of casig pipe,(if required) excluding cost of casing pipe as per is:2800 part1:1991 and is:2800 part2 1979 and tchnical specification. the work would be completed after obtaining sand free water. the tube well should have a throughout bore as per naminal bore of casing pipe nominal bore 200 dia
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Bolero Camper, Tata Xenon, Mahindra Imperio; 2021; 75, 000-1, 00, 000 kms; Non A/C; 24
Providing New Borewell and Pumping Main line at Netaji Nagar in Vadugapatti Panchayat Manapparai Block in Tiruchirappalli District under PERIURBAN PANCHAYATS 2022-23 TO 2025-26
Drilling of 150mm dia bore wells for hard rock area in overburden soil including all transportation labour charges for inserting of casing pipe. Ist depth
Providing Borewell and Pipeline at Malaiyadipatti st.Thomas Church(mount) near in Malaiyadipatti Panchayat Manapparai Block in Tiruchirappalli District under MLACDS Manapparai Savings Fund -2025-26
Drilling of 150mm dia bore wells for hard rock area in overburden soil including all transportation labour charges for inserting of casing pipe. Ist depth
Cleaning of drains and nallahs at industrial area Growth Center Jhalawar
Hiring of JCB for removal of road side overburden, malba, Garbage etc complete as per direction of Engineer in-charge. at Industrial Area, Growth Center
CONSTRUCTION OF TUBEWELL BHERU JI BASS NEAR LALASAR ROAD VILLAGE ADSAR
Construction of tube-well from ground levels and upto 100 Meter depth to accommodate housing and assembly pipe in all types of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1:1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 250 mm dia