Loading…
Loading…
2,012 results • Best match
AS PER BoQ
Regular Cleaning and upkeeping of all ROW area of roads including sweeping of road carriageway, jungle clearance & dressing of roadsides by Mechanised/manual means with all T&P, labour etc. The scope of work shall include : a) Cleaning/sweeping of road carriageway by mechanical/manual means b) Clearing of jungle/vegetation from roadsides &lifting, removal and disposal of waste/dust/earth collected by cleaning/sweeping from roadside area (complete RoW) by engaging wheelbarrow / trolly as per requirement of site. c) Dressing of roadsides by mechanical/manual means & removal of unsuitable soil, overburden etc. complete ensuring that proper slope towards the storm water drain from road carpet as well as plot boundary is maintained so that there is no accumulation of water in RoW. d) Any other work related to maintaining cleanliness in RoW and as directed by engineer-in-charge complete in all respect as per the scope of work mentioned in Annexure-1 of RFP document and directions of EIC. Note: RoW to be cleaned on weekly basis
Operation and Maintenance of Industrial Areas at Boranada (Ph-I to Ph-IV), Housing Colony Boranada, Agro Food Park, EPIP, Boranada Industrial Park, Shilpgram Pal under Unit Office Boranada.
Cleaning & upkeepment of RoW including jungle clearance & dressing of road sides : Regular Cleaning and upkeeping of all ROW area of roads including sweeping of road carriageway, jungle clearance & dressing of roadsides by Mechanised/manual means with all T&P, labour etc. The scope of work shall include : a) Cleaning/sweeping of road carriageway by mechanical/manual means.b) Clearing of jungle/vegetation from roadsides &lifting, removal and disposal of waste/dust/earth collected by cleaning/sweeping from roadside area (complete RoW) by engaging wheelbarrow / trolly as per requirement of site.c) Dressing of roadsides by mechanical/manual means & removal of unsuitable soil, overburden etc. complete ensuring that proper slope towards the storm water drain from road carpet as well as plot boundary is maintained so that there is no accumulation of water in RoW.d) Any other work related to maintaining cleanliness in RoW and as directed by engineer-in-charge complete in all respect as per the scope of work mentioned in Annexure-1 of RFP document and directions of EIC.Note: RoW to be cleaned on weekly basis.
Construction of Public Distribution Shop Building at S.Kailasapuram Village panchayat(Type II)
Drilling of borewell anywhere in Tamilnadu including transportation from one place to another in alluvial soil and overburden soil strata with bore of 140mm/150mm dia etc...complete
S/R to Birageda to Danekbadi road for the year 2025-26 (Culvert)
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
Improvement to road
Quarrying, collecting, supplying and stacking of good quality of moorum and sand in regular box heap size of 1.50m X 1.50m X 0.50m to be measured as one cum and admixing moorum and sand in (60 : 40) proportion and laying in sub-base of road in layers not exceeding 100 mm thick with all leads, lifts and delifts including cost, conveyance, royalty, cess including watering and consolidation with P.R.R., hire and running charges of machineries etc.complete as per specification and direction of the Engineer-in-Charge.
Construction of road from PWD Road (Nadbani) - Baya Road in the District of Balasore under MMSY-Improvement to Existing RD Roads for the year 2025-26
Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer-in-charge including dewatering if required.