Loading…
Loading…
2,031 results • Best match
Construction of Spur near RD 11.300 Km on Nuna Karandia right embankment near village Garam for the year 2026-27
Quarrying, collecting and supplying good quality hard broken stone of size 30cm & above from approved quarry of approved quality, free from weathered skin surface and other deleterious materials including stacking at work site for pre-measurement with quality control test of materials and conveying from stacks and Dumping at worksite in rip-rap of earth dam or dyke including filling interstices with small stones and wedge stones, hammering, surface packing & fixing wave breakers with all leads, lifts & delifts including cost, carriage, royalty, DMF, EMF, Additional charges, labour cess, other incidental charges and all other taxes of all materials etc. complete as per direction of the Engineer-in-charge. (1/6th volume will be deducted from finished level section towards voids).
Construction of Spur on Chitrotpala Left at RD 38.550 Km near village Akhua for the year 2026-27
Quarrying, collecting and supplying good quality hard broken stone of size 30cm & above from approved quarry of approved quality, free from weathered skin surface and other deleterious materials including stacking at work site for pre-measurement with quality control test of materials and conveying from stacks and Dumping at worksite in rip-rap of earth dam or dyke including filling interstices with small stones and wedge stones, hammering, surface packing & fixing wave breakers with all leads, lifts & delifts including cost, carriage, royalty, DMF, EMF, Additional charges, labour cess, other incidental charges and all other taxes of all materials etc. complete as per direction of the Engineer-in-charge. (1/6th volume will be deducted from finished level section towards voids).
Improvement to Basta PWD Road to Rajuapada to Naikudi Roadin the District of Balasore under MMSY-Improvement to Existing RD Roads for the year 2025-26
Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer-in-charge including dewatering if required.
Formation of New Reservoir in Kovalam Sub Basin in between ECR and OMR Road in Thiruporur Taluk of Chengalpattu District. (Phase1). Package 1 Eastern and Southern side.
Earth work in all soils except Medium rock / hard rock requiring blasting conveying for Formation of bund with a lead 2 km deploying earth moving machineries and tipper including benching formation of bunds, breaking clods, sectioning with a extra watering and consolidation by power roller and including hire charges etc. complete complying with standard specifications and as directed by the departmental officers.(Formation of Overburden berm and Spoil berm with 2 Km lead with consolidation)
303/2026/E2 Attending Repair and Maintenance of Water Supply arresting leakages in Main line from Sandhapettai BS to Naripallam, Ambedkarnagar, Ettimadaipudhur 100B, Sandhapettai to Pachiyamman Kovil , Annapoonga, Kumaresapuram, Nesavalarcolony 10
Plain cement concrete in 1:2:4 mix (one cement, two sand and four aggregate) using 20mm ISS hard broken granite from approved quarry including cost, conveyance of all to site, mixing, laying and curing charges etc., complete.
Attending Repair and Maintenance, arresting leakages of Main Pumping line from Avathipalayam Head Works to Santhaipettai Booster Station in Tiruchengode Municipality.(700mm and 600mm dia PSC/MS/DI Pipes and Specials)
Plain cement concrete in 1:2:4 mix (one cement, two sand and four aggregate) using 20mm ISS hard broken granite from approved quarry including cost, conveyance of all to site, mixing, laying and curing charges etc., complete.