Loading…
Loading…
2,049 results • Best match
Improvement to Mahulpati-I MIP In Tureikela Block of Balangir District Under the Scheme IDF for the year 2025
Fine dressing and turfing to the slopes of the dam or dyke with approved quality of compacted dub grass with all leads & lifts including periodical watering with conveyance, collection of turf and supply of all labour and T&P materials required for the work etc. complete as directed by the Engineer in charge including mobilization and demobilization with all incidental charges to finish the item of work and making arrangement for survival of the grass till its full growth. (Measurement is to be taken after full survival of turf on finished level section).
Improvement to Golamunda MIP In Khaprakhol Block of Balangir District Under the Scheme IDF for the year 2025 26
Fine dressing and turfing to the slopes of the dam or dyke with approved quality of compacted dub grass with all leads & lifts including periodical watering with conveyance, collection of turf and supply of all labour and T&P materials required for the work etc. complete as directed by the Engineer in charge including mobilization and demobilization with all incidental charges to finish the item of work and making arrangement for survival of the grass till its full growth. (Measurement is to be taken after full survival of turf on finished level section).
Construction of New PWD IB Balijhari at Narasinghpur Block in the district of Cuttack for the year 2025-26
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation(G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only
Construction of Paddy Procurement Center at Agarkhandi SCS for Gosani Block in the District of Gajapati (800 Sft Cover Pindi) (Civil, E.I. and P.H)
tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation(G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore. Labour for Drilling of 150 mm dia bore 0mtr to 30mtr
BUILDING WORK
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation(G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore.
Construction of 3 nos of E type Quarter (S plus 2) for Tahasil Office Balliguda at Balliguda in the district of Kandhamal for the year 2025_26 Building
Construction of 1nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories. Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only. Drilling of 200mm dia bore(00 mtr to 30mtr)