Loading…
Loading…
2,067 results • Best match
Civil, Structural and UG Piping Works on a sub-contract basis, in connection with Civil, Structural and UG Works including Piling - PART-B for PDH-PP Plant with Ethane and Propane Storage and Handling Facilities at Dahej, Gujarat
Supplying and filling sand gravel mix (1:1) with approved aggregate below road, RCC pavement, manholes, pits, foundations, bedding of UG piping etc. in layers of 150 mm loose thickness (maximum) including watering, ramming, rolling, compacting to achieve 85% relative density as per IS 2720 Part-XIV, quarrying, royalties, transportation, handling, etc. all complete as per drawings, specifications and directions of Engineer-in-Charge. (The rate shall be inclusive of the cost of all labour, material, equipment etc. all complete)
CONSTRUCTION OF MAHAKAL MAHATIRTHA IN MATIGARA, SILIGURI, DARJEELING.
Solid granite Shiv Ling (special granite imported from Nepal, 7 m height, large scale) – Supply, quarrying, transport from Nepal, rough shaping, detailed carving, polishing, and finishing; including anchoring/embedding on RCC plinth, stainless steel fasteners, scaffolding, handling, and installation as per approved design. Includes all decorative carvings, inscriptions, and smooth surface finishing. Shiv Lingam made of Shaligram / Nepal special stone /Granite
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
Providing a Ring Main System in Chennai City (GCC limit) including Operation and Maintenance for 10 years
Construction of ring bund using sand bags around the Pile cap of Pipe carrying bridge for diverting the flow of water by rasing the bund above the water level so as to carryout the Piling work including earth work excavation,piling with casurina poles ,cost of sand , gunny bags labour charges for filling, striching charges stacking charges Dewatering by providing shallow wells and pumps etc. complete and as directed by Departmental officers.Volume of each bag = 0.036 cum