Loading…
Loading…
520 results • Best match
Re-activation of Trunk Sewer from Saidpora Chowk to Khar-Bagh including Laying of Sewer line in low lying Left out Lanes
Provision for repair and restoration of under ground utilities like water supply pipes (G.I, HDPE, Cast Iron,MS Pipe etc) Telephone Cables and optic fibre etc, inlcuding all accessories required to rectify the damage caused to its original position in all respects including all carriages all told to be paid as per actual.
new building is intended to accommodate the Sub-Division and Section Offices of Kerala Water Authority, with adequate office rooms, public service areas, sanitary facilities and essential services, conforming to prevailing departmental
OD330225/2025-2026:Providing and completing the work of shifting/relocation of existing KFON and BSNL telephone/data connections from the present office building to the newly constructed office building, including dismantling at the existing location, laying of required optical fibre/telephone cables, conduits, clamps and accessories, termination, splicing/jointing, fixing of termination boxes, racks and outlets, testing and commissioning at the new premises, and restoration of services. The item shall also include all statutory fees, departmental charges, service provider charges, application fees, shifting fees and any other incidental expenses required for obtaining reconnection and activation of KFON and BSNL services at the new building. The entire work shall be completed in coordination with the concerned service providers and in accordance with their technical specifications and the directions of the Engineer-in-Charge, ensuring uninterrupted and satisfactory operation of the connections.
Building Work
40010432 LED Display Board 4' length X 1 height. Outdoor P 10 pixel,colour red, package SMD 3535,Pixel Pitch 10mm, Pixel configuration SMD3535 Black, Density 10 ,000 pixels/m (real pixel), Module Resolution 32pixel(L) * 16pixel(H), Module Dimension 320mm(L) • 160mm(H) *25mm(D),Driving Mode Constant current, 1/4 duty Module Mask Pure black mask--high contrast screen, Brightness 26,000 cd/m, Viewing Angle 120° (Horizontal); 120°(Vertical, Best Viewing Distance 210m Gray Grade 16,384 levels for each color, Display Color 4.39 Trillion Colors Brightness Adjustment 100 grades by software or automatically by sensor, Max. Power Consumption 28W,Correction Scale Level 12bits Frame Frequency 260Hz, Screen Refresh Frequency ≥1,920Hz, Gamma Correction -5.0~5.0 , Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature 5000—9300 adjustable, Brightness Correction Pixel by pixel, module by module, cabinet by cabinet, Working Temperature -20~+60 °G, Stored Temperature -30~+70°C working humidity 10% MTBF 5000 hrs,continious working time>=27hrs protection grade IP65,out of control pixel rate(> )>=0.0.1% installation with iron hanging (Make-LED:Nation Star SMP Ground Floor
Civil Work
SPACEX Shuttle Virtual Riders (Multi-User VR Experience Zone): Providing, supplying, designing and detailed engineering / shop detailing for pods, console, cable routing and ELV schematic; fabrication and supply of 4 Nos. Astronaut Pods complete with shell enclosure, base frame, seat mounting rails, service access hatch, rounded edges and wipeable finish, including supply and fixing of automotive-grade bucket seats with headrest and all mounting hardware; providing and fixing integrated tether management arm assemblies with anti-pinch cover, internal routing and strain relief for USB-C fiber optic link/tether line; providing integrated hygiene storage compartments with ventilation; providing and fixing dust-proof ventilated lockable workstation cabinet with filtered intake/exhaust fans and cable glands for 2 Nos. high-performance PCs, along with hygiene storage cabinet 600×450×1800 mm; providing and fixing operator console furniture 1200×600 mm with keyboard shelf and session start/stop provision; supply of 4 Nos. Meta Quest 3 (128GB) VR headsets complete with elite battery strap and silicone face covers, supply of 2 Nos. high-performance workstation PCs (i9/Ryzen9, 32GB DDR5, RTX 4070 Ti, 1TB NVMe), supply of operator PC with monitor, supply of USB-C fiber optic link cables (4 Nos.) and Wi-Fi 6E router (1 No.); providing complete power distribution system comprising MCB/isolator, surge protection and UPS with provisioning for headset charging, and providing conduits/trunking with segregated routing, glands, internal cabling, earthing kit and bonding of all metal pods/cabinets; including transportation, installation, integration, testing and commissioning comprising tether snag/strain relief test, cabinet thermal check under load, headset pairing with kiosk mode lock, session synchronization and operator controls verification, and trip hazard inspection with floor cable routing audit, complete submission of O&M/manuals and user training; further providing 2 Nos. custom VR shows (bespoke development, optimization and QA for supplied system) and providing 10 Nos. VR show licences (single-site commercial use) complete with content deployment/configuration in operator workflow, with 12 months warranty/support for supplied system integration, complete in all respects as per approved drawings and specifications and direction of the Engineer-in-Charge.
Rate Contract for Providing Bandwidth Broadband Plans for Leased Line 1 to 1 Connectivity and Shared-Line Connectivity services
Note 9 (Minimum Specifications required) One Time Installation Charges shall be quoted considering the distance of 200 mts. If the distance exceeds above 200 mts., then the ITG's emapnelled rate for Optical Fiber per meter will be applicable under Installation Cost
Construction of 66KV dedicated Line Bay at 220/66KV Grid Station IGC Samba to Military station Samba (MES)
Complete Automation System for 01no. 66KV Line Bay including hardware and software along with all I/O modules, communication modules, interfacing equipments, required converters and all other required items/accessories/ optical fibres etc.including complete wiring of all modules (complete job) for integration of 01no. 66KV new Line Bay into the existing system by GE.