Loading…
Loading…
526 results • Best match
Procurement of 01 No. 220/132/11 kV, 160/200 MVA Auto Transformer (A bank of 03 No. 220/132/11 kV 53.33/66.66 MVA Single Phase Auto Transformers) and 01 No. 220/132/11 kV 80/90/100 MVA 3-Phase Auto Transformer
Fibre Optic Temperature Measurement System as per specifications
Setting up of Vidhya Samiksha Kendra in the hall located in the ground floor of newly constructed extension building of State Council of Education of Research and Training District Lucknow (U.P.)
"SITC of following cables for Conference Hall and wherever required.(i) HDMI to HDMI (M) of various lengths.(ii) USB cable (A to C and A to B and A to A) of various lengths. (iii) 2 core shielded Audio microphones cables as per desire length. (iv) Speaker Cables ,UTP CAT6A , STP CAT6A cables (v) LAN patch cords of various sizes i/c all mounting accessories like connectors, brackets, sleeves etc. complete as required Note: The quotationer to quote the rate of the item considering the all cabling required for commissioning the system."
Procurement of 500MVA, 400KV/220KV/33KV Auto-Transformer (ICT) and 200MVA, 230KV/138KV/33KV Auto-Transformer
Fiber Optic Temperature Sensors with its monitor, accessories, software, etc. as per technical specification for the above transformer.
Part ll Electrical Work SH- SITC of EI LAN system Access Control System CCTV Surveillance system fire Alarm System fire fighting and Sprinkler system power Backup and Elevator system therein
Supply and fixing following port Rack Mount loaded 12 (Twelve) Port LIU with pigtail, Front-mounted cable saddles for jumper management, suitable to manage both splices and terminations, Pre-assembled shelves in multiple configurations, Rubber fiber slotted bracket built-in, metal splice shelf to protect the fibers, 2 fiber spools built-in for 900μm tight buffered fiber storing, Capable of storing up to 3 meters of 900μm tight buffered fiber per adapter, Removable front and rear covers for better access to interior of LIU, Should be Single / Multi mode LC Type fully loaded. Accessory kit consists of cable ties, mounting ear screws, and spiral wrap tube etc complete as required. Make: - D-Link Juniper/ Cisco/ Extreme/ Rittal/ ABB/ APC as approved by Engineer-In-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Procurement of computer and accessories
Title17 Fiber to Optic media converter Make Any Standard
S&T works in c/w (A) Prayagraj Division-Provision of stabling lines at Subedarganj station. (B) Construction of a new island platform at Subedarganj (SFG) by dismantling at line No. 2 & 3 along with retaining of existing PF No. 6.
Laying of HDPE duct as per the approved cable route plan in the excavated trenches/other protected 9 works/RCC channel etc. including all accessories like end caps, collars, bends, couplers etc. The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The laying of OFC cable independently or along with Quad cable/PIJF cable in the same trench shall be governed by the RDSO drawings No. RDSO/TCDO/COP-6(a) and RDSO/TCDO/COP-8 (a) respectively, issued vide Chapter-XIII of the Telecomm Manual.Inspection by-Consignee