Loading…
Loading…
2,117 results • Best match
INSTALLATION OF CCTV CAMERAS AT () GURUNANAK SRANI (i) UDHAM SINGH SARANI (i) BHAGAT SINGH SARANI at WN 13 INSTALLATION OF
Optical Fibre Cable
Construction of Kurseong Campus of Presidency University at Dowhill, Kurseong, Darjeeling, West Bengal Internet Connectivity Point to Point Connectivity and Internet Leased Line Connectivity.
Installation, Testing and Commissioning of 200-MB/s (1:1) Dedicated Internet Leased Line Connectivity including all accessories & minimum (/28 subnet) Public IP Pool and min. 99.5% Uptime. [Location: Server Room, Presidency University, Kurseong Campus at Bara Shibkhola Forest, Kurseong, West Bengal - 734 203; Interface Required: Ethernet Media : Through Single Mode Optical Fiber Cable (OFC) only and which will be Owned by Service Provider] [DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] IPS service provider has to provide WAN as well as LAN IP of (/28 subnet) Public IP Pool. Additional Terms and Condition given in NIT Documents. One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate has to provide. Accessories Required as per site requirement: 1G/10G Base SR Single Mode modular and field replaceable SFP module, LIU configuration with 10Gb Sipmlex/Duplex Single mode 9/125 OS2 LSZH Armoured Fiber Patch Cable, SC-SC/ SC-LC/ LC-LC as per sites requirements - 3 MTR. Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery. [excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network]
RE ROUTING AND ASSOCIATED WORK FOR 24 INCH X 1.4 KM SINGASANDRA KRISHNAGIRI PIPELINE AND REPLACEMENT OF PIPE SPOOL AT CH 14.2 KM FOR M/S. GAIL (INDIA) LIMITED
All works required for integration of the laid optical fibre cable with the existing optical fibre cable including identification of the existing optical fibre cable, trenching, making cut in existing Optical fibre cable, connecting the laid Optical fibre cable with the existing optical fibre cable etc., complete in all respect as per the tender and as per the direction of EIC.
Tender for Leveraging functionality of Integrated CCTV
OPTICAL FIBRE CABLE
INSTALLATION OF UNIFIED ADN AND SHIFTING OF NFS
6 Core OFC oblique 6 Core Single Mode Armoured OFC oblique Optical Fiber Cable
Odorants for CGD GA locations
OPTICAL FIBRE CABLES