Loading…
Loading…
2,158 results • Best match
Refurbishment work including replacement of network switches, OFC cable, cat-6 cable, installation of network rack, installation of RJ 45 connectors etc
12 Core Multi Mode Optical Fiber Cable
Supply and replacement of damaged and defunct CCTV surveillance system in Usmanpur area.
Supplying and drawing following core Fiber Optic Cable having corrugated steel armoring. The Fiber should be SM Fiber Central -loose tube filled with Thixotropic jelly, duly following Standards: ISO 11801, IEC 60793-1/60794-1-2, ITU-T-REC G.652D and Telecordia GR-20-core, High quality Electro Chromium Coated Corrugated Steel tape (ECCS ) and HDPE- Sheath, Operating ambient Temperature should be – 5 0C to +50 0C and Storage Temperature shall be – 5 0C to +50 0C, Max Attenuation ± 0.36 (db/ km) at Operational Wavelength 1310 nm and ± 0.22 db / km at Operational Wavelength 1550 nm. type of fiber should be 9/125 / G.652D & Refractive Index should be 1.4670/1.4675. The value for Mode-filed, Cladding Diameter 9.2 ± 0.4 µm and 125 ± 0.7 µm correspondingly. The Dispersion value 3.5 18 ps/nm-km and PMD value 0.2 ps/km and Cable Cutoff wavelength 1260 nm i/c splicing & marking etc complete as required. . Single Mode 6 Core Optical fiber cable
SITC of CCTV Cameras in Lifts and Common areas Installation of Intercom Systems inside Lifts Segregation of Residential and market entry DG Fencing and Construction of Male and Female toilet at each Cluster at Golf Homes and Kingswood project located at Plot No 2 Sector 4 Greater Noida West UP 201301
2006 Optical Distribution Frame & YD/T 1272.1-2003 Optical Fiber Connector Part
Repairing/Revival and rearrangement of Racks, OFC, Cat-6 cable, LAN points and dismantling of old RFID based Boom-Barrier system installed at Weighbridge and various location under Hazaribagh Area.
OFC cable rearrangement & laying with PVC conduit pipe(2 inch ISI mark )
DSITC of BMS at DATS
Supply, Installation, Testing & Commissioning of 6 core multicore Optical Fibre cable for connectivity between network switches as per tender specifications.
OFC rehabilitation and patch work in Alwar and Bharatpur OA of Alwar BA.
Laying of OFC by pulling/blowing method in new duct including opening of manhole, sealing of PLB HDPE Pipes by Rubber Bushes in Manholes, providing HDPE/PLB/ RCC split pipes in manhole/ back filling of manholes.