Loading…
Loading…
15,737 results • Best match
WORK NO 05 AS PER NIT
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture
REPAIR/REPLACEMENT AND MAINT SERVICING OF VARIOUS CAPACITY AND TYPE OF PUMP MOTOR AND CONNECTED CONTROLLER AND ACCESSORIES ALONGWITH ALLIED ITEMS OF WORK FOR SEWAGE AND DRAINAGE INSTALLATION UNDER AOR OF GE 864 EWS AT BB CANTT, SRINAGAR.
101 Material ,labour and other T&P with safety precaution required for de-watering storage sewage water if required at site based on related work and lifting up to maximum level from the existing separate separate rotor fitted portion/area of each pit of oxidation ditch/sump area any type/size at STP area complete with the help of if required at site providing/making temporary suitable size & capacity of pump motor with piping arrangement for lifting of storage water on ditch/sump systems and and also carried out requisite work pertaining to concerned eqpt related as demanded at site for removing & scraping existing paint, oil, dust & sludge format etc from both the system of sewage water surface rotor driving machine/rotating drum with blade and duly attend with warm reduction gear type motor of 15 HP system with it connected shaft with coupling attachment system any type/size any length any depth etc of complete body system along with it fitted all type/size of iron fitted structure framing supports system and preparation of surfaces painting work for existing main sewage receiving oxidation ditch/sump area complete system including providing and applying one coat of red oxide primer and than after applying over two coats of best quality synthetic enamel water proof paint and after completion of complete work servicing/greasing/oiling of all moving parts and its connected parts and also checking with setting & observation including rectification of all type minor defects problem occurring in rolling scraper with shaft and attachment system complete 4 EACH JOB Excess(+) Full Conversion INR
Rajkot Division - Outsourcing of track maintenance activities under SSE (P-way) DWK's section (For Two Years)
100.00 crossings , including cutting rail to required length varying from 1.00M to 1.50M , drilling holes, providing hooks & links / rings with necessary locking arrangements to fix emergency chain, leading the rail pieces from nominated station / mid section from nearest depot to site of work, erecting the rail post by making the pit of size as required and filling with CC 1:3:6 mix with 40mm aggregates and painting the rail post with two coats of synthetic enamel paint of approved colour and make, with contractor's materials, labour, paint, all lead and lifts, etc., complete as per specifications and as directed by the Engineer-in-charge. Note: (1) Rails & chain will be supplied by Railways. (2) Excavation and concrete work for foundation will be paid under relevant item.
Augmentation Segregation of 11KV Feeders to overcome LCP Constraints under UT Capex 2026-27
Providing of Painting of Poles Aluminium Paint
As per tender documents
(k) Authorised applicator of the company with trained painters will only be allowed to execute the work and the applicator will submit the experience certificate from the company. (l) Material will be kept in the custody of MES rep and will be issued to the authorised applicator as per requirement (m) Packing material/empty Buckets will not be handed over to the contractor and will be destroyed after completion of work through convening order by concerned Engr-in-charge and copy be fwd to GE office (n) Buildings will be handed over to the contractor in a phased manner and subsequently to the authorised applicator only after completion of civil work like plastering/repairing as required. Please note this point before quoting the bid as no extension of time shall be grants for the same. (o) Stage passing register will be properly maintained (p) Preparation of plastered or unplastered surface or removal of existing treatment by scrapping of walls, chajjas, cilings, fins, facias etc. shall be done using mechanical sander with internal dust extraction system for clean environment (q) All priming/painting work will be done by mechanical sprayer only (r) All rates quoted will be inclusive of all scaffolding as and when required. (s) The contractor shall submit manufacturer generated 05 years warranty card for each building during submission of RAR and Final Bill (t) Any deterioration during the warranty period will be rectified by the manufacturer without any financial effect. (u) A guaranty amount @ 10% will be kept as reserve till completion of warranty period and will be released thereafter.
ADDITIONS ALTERATIONS TO PARKING AREA AT NOM AND ADDITIONS ALTERATIONS TO NAVY HOUSE UNDER GE NAVY CHENNAI UNDER GE NAVY CHENNAI
Material and Labour for complete removal of existing surfaces including washing / rubbing down with water of wall and applying two coats of oil bound distemper/emulsion over coat of alkali resistant primer including chalk whiting over 2 coat of birla wall care putty and including necessary scaffoldings as reqd etc Smart painting work carried through manufacturer as per PS clause . complete all as specified and directed . (Make :- Interion grade acrylic emulsion shall be of the make : Asian paints "Premium Emulsion", Nerolac Paints "Beauty Gold Acrylic Emulsion, ICI Dulux "Super Smooth Acrylic Emulsion, Berger " Rangoli Acrylic Emulsion/ Equivalent).